HomeMy WebLinkAbout12.19.25 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company2From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod;
Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.;
Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Nuzum, Danielle
Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by
Pacific Gas and Electric Company
Date:Friday, December 19, 2025 8:14:20 AM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Friday, December 19, 2025 7:36 AM
Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric
Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
On 12/19/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC),
Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Part 12 Consultant Safety Inspection Reports
Description: Pacific Gas and Electric Company submits Third Part 12D Periodic Inspection Plan and Independent
Consultant Team proposal re the Round Valley Dam of the DeSabla-Centerville Hydroelectric Project under P-803.
To view the document for this Filing, click here
https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251219-
5113__;!!KNMwiTCp4spf!GEOpFfDcSufiS-CGcL0PFAeRvEWxCqdxCbP_hJXr2vO9sWYs1biWFj8-h3g-
6mYRy5iPC1DjF8P_GHuPbKiXgTiGSGn16NBPfuNP$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!GEOpFfDcSufiS-
CGcL0PFAeRvEWxCqdxCbP_hJXr2vO9sWYs1biWFj8-h3g-
6mYRy5iPC1DjF8P_GHuPbKiXgTiGSGn16MwAhkXf$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GEOpFfDcSufiS-
CGcL0PFAeRvEWxCqdxCbP_hJXr2vO9sWYs1biWFj8-h3g-
6mYRy5iPC1DjF8P_GHuPbKiXgTiGSGn16M3V2mmw$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
December 18, 2025
Via Electronic Submittal (E-File)
David E. Capka, P.E., Director
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections, Office of Energy Projects
888 First Street, N.E., Room 6N-01
Washington, D.C. 20426
RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
Round Valley Dam, NATDAM No. CA00346
Third Part 12D Periodic Inspection Plan
ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE
Dear David E. Capka:
This letter presents Pacific Gas and Electric Company’s (PG&E) Part 12D inspection plan,
including an independent consultant (IC) team proposal, for the periodic inspection (PI) of
the following dam and appurtenant structures associated with PG&E’s DeSabla-Centerville
Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. FERC
provided PG&E the general requirements of the Part 12D PI for the following dam in a
letter dated January 22, 2025.
Dam Report No. Report Due Date
Round Valley Dam 3rd November 1, 2026
The enclosed Part 12D inspection plan (Enclosures 1) includes descriptions of project
features to be inspected, a schedule for inspection-related activities, and IC team resumes.
In accordance with Title 18 of the Code of Federal Regulations, Section 12.34, PG&E
requests approval of the IC team.
PG&E’s schedule included in Enclosure 1 meets the requirement to have the IC team’s
first field activity occur at least 180 days after submitting the Part 12D inspection plan. With
FERC approval, PG&E and the IC team are available to perform the first field activity on
July 16, 2026, which would include submitting the pre-inspection preparation report 30
days before field activity begins.
Document Accession #: 20251219-5113 Filed Date: 12/19/2025
David E. Capka, P.E., Director
December 18, 2025
Page 2
Should you have technical questions concerning this matter, please contact Isabelle
Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions,
please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure: CUI//CEII – DO NOT RELEASE
1. Third FERC Part 12D Safety Inspection, Periodic Inspection, Inspection Plan, Round
Valley Dam, prepared by Geosyntec Consultants and dated December 11, 2025
cc: via encrypted email w/enclosure and FERC accession number
Frank L. Blackett, P.E., Regional Engineer
frank.blackett@ferc.gov
via hard copy w/enclosure
Erik Malvick, Ph.D., P.E., G.E., Division Manager
Department of Water Resources, Division of Safety of Dams
2720 Gateway Oaks Drive, Suite 300
Sacramento, CA 95833
Document Accession #: 20251219-5113 Filed Date: 12/19/2025
Document Content(s)
PGE20251218_803_RndVlly_P12InspectionPlanPI_Ltr.pdf ......................1
Document Accession #: 20251219-5113 Filed Date: 12/19/2025