Loading...
HomeMy WebLinkAbout12.19.25 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company2From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Friday, December 19, 2025 8:14:20 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, December 19, 2025 7:36 AM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 12/19/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits Third Part 12D Periodic Inspection Plan and Independent Consultant Team proposal re the Round Valley Dam of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251219- 5113__;!!KNMwiTCp4spf!GEOpFfDcSufiS-CGcL0PFAeRvEWxCqdxCbP_hJXr2vO9sWYs1biWFj8-h3g- 6mYRy5iPC1DjF8P_GHuPbKiXgTiGSGn16NBPfuNP$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!GEOpFfDcSufiS- CGcL0PFAeRvEWxCqdxCbP_hJXr2vO9sWYs1biWFj8-h3g- 6mYRy5iPC1DjF8P_GHuPbKiXgTiGSGn16MwAhkXf$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GEOpFfDcSufiS- CGcL0PFAeRvEWxCqdxCbP_hJXr2vO9sWYs1biWFj8-h3g- 6mYRy5iPC1DjF8P_GHuPbKiXgTiGSGn16M3V2mmw$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 December 18, 2025 Via Electronic Submittal (E-File) David E. Capka, P.E., Director Federal Energy Regulatory Commission Division of Dam Safety and Inspections, Office of Energy Projects 888 First Street, N.E., Room 6N-01 Washington, D.C. 20426 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Round Valley Dam, NATDAM No. CA00346 Third Part 12D Periodic Inspection Plan ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear David E. Capka: This letter presents Pacific Gas and Electric Company’s (PG&E) Part 12D inspection plan, including an independent consultant (IC) team proposal, for the periodic inspection (PI) of the following dam and appurtenant structures associated with PG&E’s DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. FERC provided PG&E the general requirements of the Part 12D PI for the following dam in a letter dated January 22, 2025. Dam Report No. Report Due Date Round Valley Dam 3rd November 1, 2026 The enclosed Part 12D inspection plan (Enclosures 1) includes descriptions of project features to be inspected, a schedule for inspection-related activities, and IC team resumes. In accordance with Title 18 of the Code of Federal Regulations, Section 12.34, PG&E requests approval of the IC team. PG&E’s schedule included in Enclosure 1 meets the requirement to have the IC team’s first field activity occur at least 180 days after submitting the Part 12D inspection plan. With FERC approval, PG&E and the IC team are available to perform the first field activity on July 16, 2026, which would include submitting the pre-inspection preparation report 30 days before field activity begins. Document Accession #: 20251219-5113 Filed Date: 12/19/2025 David E. Capka, P.E., Director December 18, 2025 Page 2 Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Third FERC Part 12D Safety Inspection, Periodic Inspection, Inspection Plan, Round Valley Dam, prepared by Geosyntec Consultants and dated December 11, 2025 cc: via encrypted email w/enclosure and FERC accession number Frank L. Blackett, P.E., Regional Engineer frank.blackett@ferc.gov via hard copy w/enclosure Erik Malvick, Ph.D., P.E., G.E., Division Manager Department of Water Resources, Division of Safety of Dams 2720 Gateway Oaks Drive, Suite 300 Sacramento, CA 95833 Document Accession #: 20251219-5113 Filed Date: 12/19/2025 Document Content(s) PGE20251218_803_RndVlly_P12InspectionPlanPI_Ltr.pdf ......................1 Document Accession #: 20251219-5113 Filed Date: 12/19/2025