Loading...
HomeMy WebLinkAbout12.19.25 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Friday, December 19, 2025 8:13:45 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, December 19, 2025 7:06 AM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 12/19/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits response to FERC's 11/24/2025 Comments 1-6 from the 12th Part 12D Inspection Plan for the Comprehensive Assessment and Revised Inspection Plan re the Philbrook Dam of the DeSabla-Centerville Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251219- 5096__;!!KNMwiTCp4spf!BKfCH3jSUDm0vAqAxJ0OLdLraa6QZshj3yd7bks7eXlCYre_nwczmR8WTTUH_FjD95C11EbmkXmvTYctplb0w9XENmB_JXjSAE1V$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!BKfCH3jSUDm0vAqAxJ0OLdLraa6QZshj3yd7bks7eXlCYre_nwczmR8WTTUH_FjD95C11EbmkXmvTYctplb0w9XENmB_JSCMLNlV$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 December 18, 2025 Via Electronic Submittal (E-File) David E. Capka, P.E., Director Federal Energy Regulatory Commission Division of Dam Safety and Inspections, Office of Energy Projects 888 First Street, N.E., Room 6N-01 Washington, D.C. 20426 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 12th Part 12D Inspection Plan for Comprehensive Assessment Responses to FERC Comments 1–6 Revised Inspection Plan ENCLOSURES CONTAINS CUI//CEII – DO NOT RELEASE Dear David E. Capka: This letter presents Pacific Gas and Electric Company's (PG&E) responses to address the Federal Energy Regulatory Commission’s (FERC) comments (C-1 through C-6) on the 12th Part 12D inspection plan (dated October 14, 2025) for the comprehensive assessment of Philbrook Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, FERC No. 803. PG&E received FERC’s comments in a letter dated November 24, 2025. PG&E's responses to FERC’s comments are enclosed with this letter (Enclosure 1). A revised inspection plan is provided in (Enclosure 2). PG&E believes FERC’s comments have been satisfactorily addressed based on the information enclosed with this letter and no further action is necessary. Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. Conclusions to FERC Comments on the 12th Part 12D Inspection Plan for Comprehensive Assessment 2. Twelfth FERC Part 12D Safety Inspection, Comprehensive Assessment, Revised Inspection Plan, Philbrook Dams, prepared by Geosyntec and dated December 15, 2025. cc: See Attached List Document Accession #: 20251219-5096 Filed Date: 12/19/2025 Frank L. Blackett, P.E., Regional Engineer December 18, 2025 Page 2 cc: via encrypted email w/enclosure and FERC accession number Frank L. Blackett, P.E., Regional Engineer frank.blackett@ferc.gov cc: via hard copy w/enclosure Erik Malvick, Ph.D., P.E., G.E., Division Manager Department of Water Resources, Division of Safety of Dams 2720 Gateway Oaks Drive, Suite 300 Sacramento, CA 95833 Document Accession #: 20251219-5096 Filed Date: 12/19/2025 Document Content(s) PGE20251218_803_Philbrook_12thPart12D_Resp_Ltr.pdf........................1 Document Accession #: 20251219-5096 Filed Date: 12/19/2025