Loading...
HomeMy WebLinkAbout01.13.26 Board Correspondence_ FW_ Project Operations Compliance Report submitted in FERC P-2088-000 byFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Nuzum, Danielle; Loeser, Kamie Subject:Board Correspondence: FW: Project Operations Compliance Report submitted in FERC P-2088-000 by Date:Tuesday, January 13, 2026 8:10:47 AM Please see Board Correspondence -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, January 13, 2026 8:06 AM Subject: Project Operations Compliance Report submitted in FERC P-2088-000 by .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 1/13/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: <Not available> Docket(s): P-2088-000 Lead Applicant: South Feather Water & Power Agency Filing Type: Project Operations Compliance Report Description: South Feather Water and Power Agency submits construction plans et al. for the installation of rockfall protection adjacent to the Woodleaf Powerhouse of the South Feather Power Project under P-2088. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260113- 5038__;!!KNMwiTCp4spf!Huxfbr9aOq4E-Gi3lvPEY92sYlF1xrd_Tk7cVEaxKLhEtVxBqpinPxP-t7wG7- f7lSJ_RFr9rM-jqCYbbkGe0u-_hBLTl0LkBkhw$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Huxfbr9aOq4E- Gi3lvPEY92sYlF1xrd_Tk7cVEaxKLhEtVxBqpinPxP-t7wG7-f7lSJ_RFr9rM-jqCYbbkGe0u-_hBLTl58trJ0u$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Huxfbr9aOq4E- Gi3lvPEY92sYlF1xrd_Tk7cVEaxKLhEtVxBqpinPxP-t7wG7-f7lSJ_RFr9rM-jqCYbbkGe0u-_hBLTl5NV4fhP$ or for phone support, call 866-208-3676. January 13, 2026 Electronically Filed Frank L. Blackett, P.E., Regional Engineer 100 First Street, Suite 2300 San Francisco, CA 94105 RE: South Feather Power Project (FERC No. 2088) Project Information for Woodleaf Powerhouse Rockfall Protection and Slope Stabilization Project Dear Mr. Blackett, This letter is to transmit information pertaining to the South Feather Water and Power Agency’s plans to complete the installation of rockfall protection adjacent to the Woodleaf Powerhouse during the planned dewatering for annual maintenance. The CEII/CUI attachments for your review are listed as follows: 1. Final For Construction Project plans a. Associated Technical Memorandum b. Associated Calculations 2. Project Schedule (marked Draft subject to influence of PG&E line outage) 3. Site Specific Safety Plan 4. A scaled Quality Control Inspection Plan (QCIP) commensurate with the scope of work to be performed. If you have any questions, please feel free to contact me at (530) 534-1221 ext. 265, or via email at kmckillop@southfeather.com. Sincerely, South Feather Water and Power Agency cc: Hunter Doyle, Power Division Manager Silas Sanderson, PE, Chief Dam Safety Engineer Document Accession #: 20260113-5038 Filed Date: 01/13/2026 Document Content(s) to FERC_01132026_submittal project plans for WPH rock scaling and slope stabilization.pdf.........................................................1 Document Accession #: 20260113-5038 Filed Date: 01/13/2026