Loading...
HomeMy WebLinkAbout01.12.26 Board Correspondence - FW_ Delegated Order issued in FERC P-619-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Delegated Order issued in FERC P-619-000 Date:Monday, January 12, 2026 4:53:59 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, January 12, 2026 8:21 AM Subject: Delegated Order issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 1/12/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Delegated Order Description: Letter to Pacific Gas and Electric Company granting the 12/03/2025 request for an extension of time to address Recommendation 1a with Spillway Rehabilitation Project from the 11th Part 12D Report for the Lower Bucks Dam, part of Bucks Creek Proj., P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260112- 3018__;!!KNMwiTCp4spf!FwH7W00g8ip4uK3NCBqeSS5vc7Y367uEHKSA4Ohj6rykXqTFHbxqd-oatKYnj5QqY8RDjNvA0zB744s96ALt_-AN-F9B3PtO3dBR$ To modify your subscriptions, click here: oatKYnj5QqY8RDjNvA0zB744s96ALt_-AN-F9B3A7cXYQc$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!FwH7W00g8ip4uK3NCBqeSS5vc7Y367uEHKSA4Ohj6rykXqTFHbxqd- oatKYnj5QqY8RDjNvA0zB744s96ALt_-AN-F9B3GpnrVcF$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office January 12, 2026 In reply refer to: Project No.619-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Extension of Time Request to Address Recommendation 1a (R-1a)with Spillway Rehabilitation Project from the 11th Part 12D Safety Inspection Report Dear Mr.Cruzen: This is in response to a letter dated December 3, 2025,from Mr.Robert Ellis,that submitted a request for an extension of time to address recommendation 1a (R-1a) with Spillway Rehabilitation Project from the 11th Part 12D report for Lower Bucks Dam, which is part of Bucks Creek Project, FERC No. 619.We have reviewed your proposed extension of time and grant your request to address R-1a with the spillway rehabilitation project by February 28, 2027. File your submittal using our eFiling system at https://www.ferc.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your continued efforts in this aspect of our dam safety program. If you have any questions, contact Ms. Eunhye Kim at (415) 369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20260112-3018 Filed Date: 01/12/2026 Frank L Blackett Digitally signed by Frank L Blackett Date: 2026.01.12 07:33:22 -08'00' Document Content(s) P-619-000_99599_R1a_11th_Const_LowerBucks_EOT.docx.pdf....................1 Document Accession #: 20260112-3018 Filed Date: 01/12/2026