Loading...
HomeMy WebLinkAbout01.08.26 Board Correspondence - FW_ Compliance Directives issued in FERC P-619-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-619-000 Date:Thursday, January 8, 2026 1:21:43 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, January 8, 2026 1:16 PM Subject: Compliance Directives issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 1/8/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Compliance Directives General Correspondence Description: Letter to Pacific Gas and Electric Company providing a comment on the 07/17/2025 summary and conclusion to address 2025 Dam Safety Inspection Follow-up Item No. 1 at the Bucks Lake Dam, part of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20260108-3084__;!!KNMwiTCp4spf!GRyXpMJE1ZQwy_Z91kjNOr- TbRFhININRlp8bnYdGiO244z9IRdqM2hwxLMThFrWLLCqKXUOe2uMCLsjm1mH079lJ3fNZXDcCrBk$ To modify your subscriptions, click here: TbRFhININRlp8bnYdGiO244z9IRdqM2hwxLMThFrWLLCqKXUOe2uMCLsjm1mH079lJ3fNZZxkY0XA$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GRyXpMJE1ZQwy_Z91kjNOr- TbRFhININRlp8bnYdGiO244z9IRdqM2hwxLMThFrWLLCqKXUOe2uMCLsjm1mH079lJ3fNZcLan4Ja$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office January 8, 2026 In reply refer to: Project No.619-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric (PG&E)Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:2025 Dam Safety Inspection Follow-up Action Item 1 Response Dear Mr.Cruzen: This is in response to a letter dated July 17, 2025,from Mr. Robert Ellis that submitted a summary and conclusion to address 2025 Dam Safety Inspection follow-up item 1 at Bucks Lake Dam,which is part of the Bucks Creek Hydroelectric Project, FERC No. 619. We have reviewed the submittal, and we have the following comment. We acknowledge that the hole in question was backfilled during the inspection. However, we understood from verbal conversations that the area would be repaired more appropriately at a later date. Confirm your intentions regarding the repair of this hole since your letter is different from our understanding at the time. Also add this area to your routine monitoring to ensure no additional voids develop. Within 45 days of the date of this letter, address the comment above or provide a plan and schedule to address the comment. File your submittal using our eFiling system at https://www.ferc.gov/ferc-online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). Document Accession #: 20260108-3084 Filed Date: 01/08/2026 2 We appreciate your cooperation in this aspect of our dam safety program. If you have any questions, contact Ms. Eunhye Kim at (415)369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20260108-3084 Filed Date: 01/08/2026 Frank L Blackett Digitally signed by Frank L Blackett Date: 2026.01.08 12:34:34 -08'00' Document Content(s) P-619-000_81068_Item1_2025_DSI_Bucks Lake.docx.pdf........................1 Document Accession #: 20260108-3084 Filed Date: 01/08/2026