Loading...
HomeMy WebLinkAbout12.29.25 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company Date:Monday, December 29, 2025 4:10:10 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, December 29, 2025 4:06 PM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 12/29/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits plan and schedule to address recommendations from the 12th Part 12D Safety Inspection Report Comprehensive Assessment re the Grizzly Forebay Dam of Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20251229-5496__;!!KNMwiTCp4spf!G2ZRq8l7mFS_M9zXsz4fOBaP-CwCZqYJxn6UgqE- 37o0zz3vxeVV0uqqB6SlKNkTTAilFzpy6mVhQcJxIXfmtXpSCtRn9p_7zKmw$ To modify your subscriptions, click here: CwCZqYJxn6UgqE-37o0zz3vxeVV0uqqB6SlKNkTTAilFzpy6mVhQcJxIXfmtXpSCtRn9rChJKD9$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!G2ZRq8l7mFS_M9zXsz4fOBaP- CwCZqYJxn6UgqE-37o0zz3vxeVV0uqqB6SlKNkTTAilFzpy6mVhQcJxIXfmtXpSCtRn9orXba6t$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 December 29, 2025 Via Electronic Submittal (E-file) Frank L. Blackett P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Grizzly Forebay Dam, NATDAM No. CA00333 12th Part 12D Inspection – Plans and Schedules for Recommendations ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) plans and schedules to address recommendations from the 12th Part 12D safety inspection report (comprehensive assessment [CA]) (dated October 31, 2025) for Grizzly Forebay Dam, which is part of PG&E’s Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. PG&E prepared the plans and schedules in accordance with Title 18 of the Code of Federal Regulation (CFR), Section 12.41. PG&E submitted the CA report to FERC in a letter dated October 31, 2025. PG&E’s proposed plans and schedules to address the recommendations are enclosed with this letter for FERC review (Enclosure 1). In accordance with Title 18 of the CFR, Section 12.41(a)(2), PG&E plans to provide its first annual status report on the CA report recommendations by December 31, 2026. Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Grizzly Forebay Plans and Schedules for Recommendations from the 12th Part 12D Inspection –Comprehensive Assessment Report Document Accession #: 20251229-5496 Filed Date: 12/29/2025 Document Content(s) PGE20251229_619_Grizzly_12thPart12D_CA_P&S_Ltr.pdf........................1 Document Accession #: 20251229-5496 Filed Date: 12/29/2025