HomeMy WebLinkAbout12.29.25 Board Correspondence - FW_ Annual Spill Gate Testing Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter,
Doug; Zepeda, Elizabeth
Cc:Nuzum, Danielle; Loeser, Kamie
Subject:Board Correspondence - FW: Annual Spill Gate Testing Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.
Date:Monday, December 29, 2025 8:13:30 AM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Monday, December 29, 2025 5:56 AM
Subject: Annual Spill Gate Testing Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 12/29/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Pacific Gas & Electric Company (as Agent)
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Annual Spill Gate Testing Report
Description: Pacific Gas and Electric Company submits 2025 Annual Spillway Gate Operation Certificate re the Philbrook Dam of the DeSabla-Centerville Hydroelectric Project under P-803.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251229-
5099__;!!KNMwiTCp4spf!EqfgwiC3inUuTUvYrpuj6ykttR04PFiBvvusN5tXrvmpfBh5fHTOkaxY0hsmnb6zwGw6WD6Ck5l5DZ8Gc2CUzkoqw1l_oNI6sShA$
To modify your subscriptions, click here:
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!EqfgwiC3inUuTUvYrpuj6ykttR04PFiBvvusN5tXrvmpfBh5fHTOkaxY0hsmnb6zwGw6WD6Ck5l5DZ8Gc2CUzkoqw1l_oDhc8W3Q$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
December 24, 2025
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
Philbrook Dam, NATDAM No. CA00345
2025 Annual Spillway Gate Operation Certificate
ENCLOSURES CONTAIN CUI/CEII – DO NOT RELEASE
Dear Frank L. Blackett:
Enclosed is Pacific Gas and Electric Company’s (PG&E) notarized certificate for the 2025
spillway gate operations for the following dam:
FERC Project Dam Name Gate Type
No. of
Gates
DeSabla-Centerville Hydroelectric Project, FERC No. 803 Philbrook Dam Radial 1
The certificate (Enclosure 1) is being submitted pursuant to Part 12, Subpart E, Section
12.44(b), of the Federal Energy Regulatory Commission’s (FERC) regulations. PG&E’s work
management gate form is provided in (Enclosure 2).
Should you have technical questions concerning this matter, please contact Angie Hodskins,
gates and valves asset management lead engineer for PG&E, at (530) 854-3576. For general
questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosures: CUI/CEII – DO NOT RELEASE
1. 2025 Annual Spillway Gate Operation Certificate
2. PG&E Work Management Gate Form
Document Accession #: 20251229-5099 Filed Date: 12/29/2025
Document Content(s)
PGE20251224_803_Philbrook_GateCertificates_Ltr.pdf........................1
Document Accession #: 20251229-5099 Filed Date: 12/29/2025