HomeMy WebLinkAbout12.29.25 Board Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts,
Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney,
Kathleen; Teeter, Doug; Zepeda, Elizabeth; Nuzum, Danielle
Cc:Lee, Lewis
Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific
Gas and Electric Company,et al.
Date:Monday, December 29, 2025 8:13:41 AM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Monday, December 29, 2025 6:46 AM
Subject: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric
Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
On 12/29/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington
D.C.:
Filer: Pacific Gas and Electric Company
Pacific Gas & Electric Company (as Agent)
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Request for Delay of Action/Extension of Time
Description: Pacific Gas and Electric Company submits request for an extension of time until 03/31/2027 to complete
spillway repairs and a final construction report at the Hendricks Head Dam of the DeSabla-Centerville Hydroelectric
Project under P-803.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?
accession_num=20251229-5135__;!!KNMwiTCp4spf!AbG8nIoDW3kJmTB7B-
lri5k83zzHp1xtY3z8zL5mq0Uq2y5OScX87nfd6VLWgH5I3EdYlE0rFyyn7KW9ksYy5vMnvnn5FD5lonus$
To modify your subscriptions, click here:
lri5k83zzHp1xtY3z8zL5mq0Uq2y5OScX87nfd6VLWgH5I3EdYlE0rFyyn7KW9ksYy5vMnvnn5FO_h6yBn$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AbG8nIoDW3kJmTB7B-
lri5k83zzHp1xtY3z8zL5mq0Uq2y5OScX87nfd6VLWgH5I3EdYlE0rFyyn7KW9ksYy5vMnvnn5FOmvOK1l$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
December 24, 2025
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
Hendricks Head Dam, NATDAM No. CA00702
Spillway Repair Project, Final Construction Report
Extension of Time Request
ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents Pacific Gas and Electric Company’s (PG&E) request for an extension
of time to complete spillway repairs and a final construction report for the spillway repairs
at Hendricks Head Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric
Project, Federal Energy Regulatory Commission (FERC) No. 803. Included with PG&E’s
extension of time request is a reasoned basis for the request, per Title 18 of the Code of
Federal Regulations, Section 12.40(d). PG&E submitted its construction authorization in a
letter to your office dated August 30, 2024, which FERC subsequently approved in a letter
dated September 10, 2025.
The extension of time request and reason for the request are enclosed with this letter
(Enclosure 1).
Should you have technical questions concerning this matter, please contact Isabelle
Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions,
please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure: CUI//CEII – DO NOT RELEASE
1. Extension of Time Request for Spillway Final Construction Report
Document Accession #: 20251229-5135 Filed Date: 12/29/2025