Loading...
HomeMy WebLinkAbout12.29.25 Board Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Nuzum, Danielle Cc:Lee, Lewis Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Monday, December 29, 2025 8:13:41 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, December 29, 2025 6:46 AM Subject: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 12/29/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Request for Delay of Action/Extension of Time Description: Pacific Gas and Electric Company submits request for an extension of time until 03/31/2027 to complete spillway repairs and a final construction report at the Hendricks Head Dam of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20251229-5135__;!!KNMwiTCp4spf!AbG8nIoDW3kJmTB7B- lri5k83zzHp1xtY3z8zL5mq0Uq2y5OScX87nfd6VLWgH5I3EdYlE0rFyyn7KW9ksYy5vMnvnn5FD5lonus$ To modify your subscriptions, click here: lri5k83zzHp1xtY3z8zL5mq0Uq2y5OScX87nfd6VLWgH5I3EdYlE0rFyyn7KW9ksYy5vMnvnn5FO_h6yBn$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AbG8nIoDW3kJmTB7B- lri5k83zzHp1xtY3z8zL5mq0Uq2y5OScX87nfd6VLWgH5I3EdYlE0rFyyn7KW9ksYy5vMnvnn5FOmvOK1l$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 December 24, 2025 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Hendricks Head Dam, NATDAM No. CA00702 Spillway Repair Project, Final Construction Report Extension of Time Request ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) request for an extension of time to complete spillway repairs and a final construction report for the spillway repairs at Hendricks Head Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. Included with PG&E’s extension of time request is a reasoned basis for the request, per Title 18 of the Code of Federal Regulations, Section 12.40(d). PG&E submitted its construction authorization in a letter to your office dated August 30, 2024, which FERC subsequently approved in a letter dated September 10, 2025. The extension of time request and reason for the request are enclosed with this letter (Enclosure 1). Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Extension of Time Request for Spillway Final Construction Report Document Accession #: 20251229-5135 Filed Date: 12/29/2025 Document Content(s) PGE20251224_803_HendricksHead_FCR_EOT_Ltr.pdf.............................1 Document Accession #: 20251229-5135 Filed Date: 12/29/2025