Loading...
HomeMy WebLinkAbout12.29.25 Board Correspondence - FW_ Annual Spill Gate Testing Report submitted in FERC P-2107-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Nuzum, Danielle; Loeser, Kamie Subject:Board Correspondence - FW: Annual Spill Gate Testing Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company Date:Monday, December 29, 2025 8:13:04 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, December 29, 2025 4:26 AM Subject: Annual Spill Gate Testing Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 12/29/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-2107-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Annual Spill Gate Testing Report Description: Pacific Gas and Electric Company submits 2025 Annual Spillway Gate Operation Certificate re the Poe Dam of the Poe Hydroelectric Project under P-2107. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20251229- 5037__;!!KNMwiTCp4spf!DS_JxaGUXOLZkLzNmNwDCtQP1KL0BiuP4JLXqFujMtXI7JFRo5pZtFOfLPZSmurUq-gpdttrgqnQKZXqchmOV8q8Oei2l0M_ei0X$ To modify your subscriptions, click here: gpdttrgqnQKZXqchmOV8q8Oei2l6XcqjYg$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DS_JxaGUXOLZkLzNmNwDCtQP1KL0BiuP4JLXqFujMtXI7JFRo5pZtFOfLPZSmurUq- gpdttrgqnQKZXqchmOV8q8Oei2l6oAg6Kg$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 December 23, 2025 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Poe Hydroelectric Project, FERC No. 2107-CA Poe Dam, NATDAM No. CA00328 2025 Annual Spillway Gate Operation Certificate ENCLOSURES CONTAIN CUI/CEII – DO NOT RELEASE Dear Frank L. Blackett: Enclosed is Pacific Gas and Electric Company’s (PG&E) notarized certificate for the 2025 spillway gate operations for the following dam: FERC Project Dam Name Gate Type No. of Gates Poe Hydroelectric Project, FERC No. 2107 Poe Dam Radial 5 The certificate (Enclosure 1) is being submitted pursuant to Part 12, Subpart E, Section 12.44(b), of the Federal Energy Regulatory Commission’s (FERC) regulations. In accordance with Chapter 14, Appendix L, of the FERC guidelines, the amperage readings and apparent trends are discussed in (Enclosure 2) and phase current and voltage plots are provided in (Enclosure 3) of this letter. A PG&E work management gate form is provided in (Enclosure 4). Should you have technical questions concerning this matter, please contact Angie Hodskins, gates and valves asset management lead engineer for PG&E, at (530) 854-3576. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI/CEII – DO NOT RELEASE 1. 2025 Annual Spillway Gate Operation Certificate 2. Summary of Amperage Readings and Apparent Trends 3. Phase Current and Voltage Plots 4. PG&E Work Management Gate Form Document Accession #: 20251229-5037 Filed Date: 12/29/2025 Document Content(s) PGE20251223_2107_PoeDam_GateCert_Ltr.pdf..................................1 Document Accession #: 20251229-5037 Filed Date: 12/29/2025