Loading...
HomeMy WebLinkAboutADM-26-0004 Approved AP2 of 2 PERMIT REQUIREMENTS 1.The installation of co-location facilities allowed requires the issuance of a building permitfrom the Building Division. The Building Division, based upon engineered calculationssubmitted by the applicant, may determine that the wireless telecommunications facilitycannot safely physicallysuppor the requested co-location facility. If this is the case, thecolocation facility allowed on the wireless telecommunications facility shall only becommensurate with what can be safely physically supported by the wireless communicationsfacility, as determined by the Building Division. 2.All equipment shelters, cabinets, or structures utilizied or built in connection with the facilities shall be located within the building being utilized for the facility,or on the ground outside of any setback area.3.The antennas and array shall be painted to match the color of the existing antennas and pole or tower.4.Environmental Health has given clearance for any Hazardous Materials Plan.5.Additional facilities shall not extend out horizontally from the pole more than the widest existing projection. The use of proximity designs is encouraged. Approval of this permit is final and effective after 5:00 p.m. on the 10th day following the date the decision is rendered, when no appeal to the decision or call for review has been filed. In the event the completion of appeal period falls on a weekend or County recognized holiday, the decision shall be effective after 5:00 p.m. on the first business day following completion of the appeal period. A permit or approval not exercised within two years after the date of approval shall expire and become void, except wher an extension of time is approved as allowed by BCC §24-247 C. The Zoning Administrator may revoke its approval of this Administrative Permit, if any of the following applies: a.The applicant or property owner has altered the circumstances under which the permit wasgranted to a degree that one or more of the findings required to grant the original permit canno longer be made; b.Permit issuance was based on misrepresentation by the applicant through the omission of a material statement in the application; c.One or more of the permit conditions of approval have not been complied with or fulfilled; d.The applicant or property owner has failed or refused to allow inspections for compliance; e.Improvements authorized by the permit are in violation of the Zoning Ordinance or any law,ordinace, regulation, or statute; or f.The use is being operated in a manner which constitutes a nuisance. _______________ Applicant’s Initials