HomeMy WebLinkAbout02.23.26 Board Correspondence_ FW_ General Correspondence issued in FERC P-2088-0003From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett,
Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Nuzum, Danielle
Subject:Board Correspondence: FW: General Correspondence issued in FERC P-2088-000
Date:Monday, February 23, 2026 1:47:26 PM
Please see Board Correspondence
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Monday, February 23, 2026 12:46 PM
Subject: General Correspondence issued in FERC P-2088-000
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 2/23/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-2088-000
Lead Applicant: South Feather Water & Power Agency
Filing Type: General Correspondence
Description: Letter to South Feather Water and Power Agency discussing the 11/28/2022 Twelfth Independent Consultant's Safety Inspection Report for the Lost Creek
Dam, part of the South Feather Power Project under P-2088.
To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260223-
3079__;!!KNMwiTCp4spf!EAsYtdnXcCeNUvt2mOAtsaL7dkrNuGoD65MNCiRVHDTpyax_PpsMS88v-szmnte4nclHGqDOnr5KWcZq9vA8VKU9Ol5eWO1SHWl4$
To modify your subscriptions, click here:
szmnte4nclHGqDOnr5KWcZq9vA8VKU9Ol5eWDXf-paV$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!EAsYtdnXcCeNUvt2mOAtsaL7dkrNuGoD65MNCiRVHDTpyax_PpsMS88v-
szmnte4nclHGqDOnr5KWcZq9vA8VKU9Ol5eWIT-gT9A$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections –San Francisco Regional Office
February 23, 2026
In reply refer to:
Project No. 2088-CA
VIA FERC Service
Mr. Rath Moseley
General Manager
South Feather Water and Power Agency
2310 Oro-Quincy Highway
Oroville, CA 95965
Re:12th Independent Consultant’s Safety Inspection Report for Lost Creek Dam
Dear Mr. Moseley:
This is in response to a letter dated November 28, 2022,from Ms. Kristen
McKillop,that submitted the 12th Independent Consultant’s Safety Inspection Report
(Part 12D report)for Lost Creek Dam, which is part of the South Feather Power Project,
FERC No. 2088. Our review of the document concludes that the scope and content of the
report satisfies the requirements of Part 12, Subpart D, §12.37 of Title 18 of the Code of
Federal Regulations.The Part 12D Report was found to be prepared in general
accordance with the Engineering Guidelines Chapter 14 outline,provided in our reminder
letter dated August 19, 2021.We have completed our review and have no comments.
We appreciate your continued efforts in this aspect of our dam safety program.If
you have any questions, please contact Mr. Sam Lee at (415)369-3393.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer
Document Accession #: 20260223-3079 Filed Date: 02/23/2026
Frank L Blackett Digitally signed by Frank L Blackett
Date: 2026.02.23 12:15:42 -08'00'
Document Content(s)
P-2088-000 58986 Lost Creek P12D ltr.docx.pdf.............................1
Document Accession #: 20260223-3079 Filed Date: 02/23/2026