Loading...
HomeMy WebLinkAbout02.19.26 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Thursday, February 19, 2026 5:00:08 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, February 19, 2026 12:06 PM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 2/19/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: California Department of Fish and Wildlife Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits summary and conclusion to address Recommendation 5 from the 10th and 11th Part 12D Safety Inspection Report et al. re the Philbrook Dam, part of the DeSabla- Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260219- 5104__;!!KNMwiTCp4spf!FzDm-WqsUtdaUwuj7rqbHaQDAZ_I5nwWuZB_VqX_vqGe16fesWv3gCS- XV8g7VoM6p9p8LNfrs7CSQGMe6EF03YzD-KtEKr3ewUj$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!FzDm- WqsUtdaUwuj7rqbHaQDAZ_I5nwWuZB_VqX_vqGe16fesWv3gCS- XV8g7VoM6p9p8LNfrs7CSQGMe6EF03YzD-KtEAd4lHm7$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!FzDm- WqsUtdaUwuj7rqbHaQDAZ_I5nwWuZB_VqX_vqGe16fesWv3gCS- XV8g7VoM6p9p8LNfrs7CSQGMe6EF03YzD-KtEBIWNUo9$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 February 19, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 10th Part 12D Inspection – Summary and Conclusion for Recommendation 5 11th Part 12D Inspection – Summary and Conclusion for Recommendation 5 ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter reports on the completion of Pacific Gas and Electric Company's (PG&E) efforts to address Recommendation 5 (15-R5) from the 10th Part 12D safety inspection report (dated October 2015) and Recommendation 5 (20-R5) from the 11th Part 12D safety inspection report (dated October 2020) for Philbrook Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. PG&E provided a status update and extension of time (EOT) request regarding the efforts to address the recommendations in a letter dated May 24, 2023, and most recently requested an EOT in a letter dated January 28, 2025. Summaries and conclusions of PG&E’s efforts to address 15-R5 and 20-R5 are provided in (Enclosure 1) of this letter. PG&E believes 15-R5 and 20-R5 have been satisfactorily addressed based on the information enclosed with this letter. Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Summaries and Conclusions for Recommendation 5 from the 10th Part 12D Safety Inspection Report and Recommendation 5 from the 11th Part 12D Safety Inspection Report Document Accession #: 20260219-5104 Filed Date: 02/19/2026 Document Content(s) PGE20260219_803_Philbrook_ConstRpt_Final_R5Close_Ltr.pdf .................1 Document Accession #: 20260219-5104 Filed Date: 02/19/2026