Loading...
HomeMy WebLinkAbout02.19.26 Board Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:BOS; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Thursday, February 19, 2026 4:59:35 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, February 19, 2026 8:46 AM Subject: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 2/19/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: California Department of Fish and Wildlife Filing Type: Request for Delay of Action/Extension of Time Description: Pacific Gas and Electric Company submits request for extension of time until 05/30/2026 to submit Final Construction Report for Phases 1.1 and 1.2 of the Orofino 1102 Electric Undergrounding Project of the DeSabla-Centerville Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20260219-5043__;!!KNMwiTCp4spf!C5qtQuDtyljFG9NKpCcbcHt8- IAHiNI5OnywF1Yn6tmICub7beSSK8NqK7FcAanG_8W0426zvhfe84eGreJbdGFoRLYXl1aHqLgz$ To modify your subscriptions, click here: IAHiNI5OnywF1Yn6tmICub7beSSK8NqK7FcAanG_8W0426zvhfe84eGreJbdGFoRLYXl0HdxakY$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!C5qtQuDtyljFG9NKpCcbcHt8- IAHiNI5OnywF1Yn6tmICub7beSSK8NqK7FcAanG_8W0426zvhfe84eGreJbdGFoRLYXl79YZk4S$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 February 19, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Orofino 1102 Electric Undergrounding Project, Phases 1.1 and 1.2 Extension of Time Request for Final Construction Report Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) request for an extension of time to file a final construction report (FCR) for Phases 1.1 and 1.2 of the Orofino 1102 electric undergrounding project, which is within the boundary of PG&E’s DeSabla-Centerville Hydroelectric Project, FERC No. 803. In a letter dated March 13, 2025, FERC authorized PG&E to proceed with the project and requested that PG&E file the FCR for the project within 90 days of completion of construction of the facilities authorized by this letter, or no later than March 19, 2026. The construction project was completed on October 24, 2025. PG&E is seeking additional time to adequately prepare the FCR and the as-built drawings requested by FERC in its letter dated March 13, 2025. PG&E respectfully requests an extension of time to submit the report to FERC by May 30, 2026. Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359 -5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Joe Landucci, P.E. Manager, Power Generation Project Engineering Document Accession #: 20260219-5043 Filed Date: 02/19/2026 Document Content(s) PGE20260219_803_Orofino_1.1&1.2_FCR_EOT.pdf...............................1 Document Accession #: 20260219-5043 Filed Date: 02/19/2026