HomeMy WebLinkAbout02.17.26 Board Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Tuesday, February 17, 2026 3:41:44 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, February 17, 2026 2:26 PM Subject: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 2/17/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: California Department of Fish and Wildlife Filing Type: Request for Delay of Action/Extension of Time Description: Pacific Gas and Electric Company submits request for extension of time until 05/11/2026 to provide the final construction report for weir modification project at the Philbrook Dam of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260217- 5282__;!!KNMwiTCp4spf!HBWnFterJ_LMKwj0Ejk0bDSntuufqgK0kKutBFX1CdJ88RQ9QXrZpqRNBYTqSlu-s-DKZG7NCuiofeQTcmaNR7iTPutclUDde0Lq$ To modify your subscriptions, click here: s-DKZG7NCuiofeQTcmaNR7iTPutclWc_IcCp$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HBWnFterJ_LMKwj0Ejk0bDSntuufqgK0kKutBFX1CdJ88RQ9QXrZpqRNBYTqSlu-s- DKZG7NCuiofeQTcmaNR7iTPutclUuF33B7$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 February 17, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 Weir Modification Project – Final Construction Report Extension of Time Request Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) request for an extension of time to provide the final construction report for weir modification project at Philbrook Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. Included with PG&E’s extension of time request is a reasoned basis for the request, per Title 18 of the Code of Federal Regulations, Section 12.40(d). In a letter dated November 4, 2025, FERC authorized PG&E to proceed with the project and requested that PG&E file a final construction report for the project within 90 days of construction completion. The construction project was completed on November 24, 2025. PG&E is preparing a brief construction report but needs additional time to complete the as- built drawings. PG&E requests an extension until May 11, 2026, to submit the report to FERC. Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359 -5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Joe Landucci, P.E. Manager, Power Generation Project Engineering Document Accession #: 20260217-5282 Filed Date: 02/17/2026 Document Content(s) PGE20260217_803_Phillbrook_Weir_ModConst_Rpt_EOT.pdf......................1 Document Accession #: 20260217-5282 Filed Date: 02/17/2026