HomeMy WebLinkAbout02.17.26 Board Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter,
Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Nuzum, Danielle
Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company
Date:Tuesday, February 17, 2026 3:41:44 PM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Tuesday, February 17, 2026 2:26 PM
Subject: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 2/17/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-803-000
Lead Applicant: California Department of Fish and Wildlife
Filing Type: Request for Delay of Action/Extension of Time
Description: Pacific Gas and Electric Company submits request for extension of time until 05/11/2026 to provide the final construction report for weir modification project at the
Philbrook Dam of the DeSabla-Centerville Hydroelectric Project under P-803.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260217-
5282__;!!KNMwiTCp4spf!HBWnFterJ_LMKwj0Ejk0bDSntuufqgK0kKutBFX1CdJ88RQ9QXrZpqRNBYTqSlu-s-DKZG7NCuiofeQTcmaNR7iTPutclUDde0Lq$
To modify your subscriptions, click here:
s-DKZG7NCuiofeQTcmaNR7iTPutclWc_IcCp$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HBWnFterJ_LMKwj0Ejk0bDSntuufqgK0kKutBFX1CdJ88RQ9QXrZpqRNBYTqSlu-s-
DKZG7NCuiofeQTcmaNR7iTPutclUuF33B7$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
February 17, 2026
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
Philbrook Dam, NATDAM No. CA00345
Weir Modification Project – Final Construction Report
Extension of Time Request
Dear Frank L. Blackett:
This letter presents Pacific Gas and Electric Company’s (PG&E) request for an extension of
time to provide the final construction report for weir modification project at Philbrook Dam,
which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, Federal Energy
Regulatory Commission (FERC) No. 803. Included with PG&E’s extension of time request is
a reasoned basis for the request, per Title 18 of the Code of Federal Regulations, Section
12.40(d). In a letter dated November 4, 2025, FERC authorized PG&E to proceed with the
project and requested that PG&E file a final construction report for the project within 90 days
of construction completion. The construction project was completed on November 24, 2025.
PG&E is preparing a brief construction report but needs additional time to complete the as-
built drawings. PG&E requests an extension until May 11, 2026, to submit the report to
FERC.
Should you have technical questions concerning this matter, please contact Isabelle
Rawlings, senior dam safety engineer for PG&E, at (925) 359 -5420. For general questions,
please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Joe Landucci, P.E.
Manager, Power Generation Project Engineering
Document Accession #: 20260217-5282 Filed Date: 02/17/2026