Loading...
HomeMy WebLinkAbout03.04.26 Board Correspondence_ FW_ Compliance Directives issued in FERC P-803-000From:Clerk of the Board To:Loeser, Kamie; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Cannon, Jamie Subject:Board Correspondence: FW: Compliance Directives issued in FERC P-803-000 Date:Wednesday, March 4, 2026 9:55:43 AM Please see Board Correspondence Please note that my email has changed. Please update your records: skrater@buttecounty.ca.gov Sharleen L Krater Administrative Analyst Supervisor Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3353 www.buttecounty.net | skrater@buttecounty.ca.gov . -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, March 4, 2026 9:36 AM Subject: Compliance Directives issued in FERC P-803-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 3/4/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Compliance Directives General Correspondence Description: Letter to Pacific Gas and Electric Company providing comments on the 01/28/2026 notification of completion of the Follow-up Items Nos. 3 and 4 etc. for the Philbrook Main Dam et al., parts of the DeSabla-Centerville Project under P-803. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20260304-3036__;!!KNMwiTCp4spf!AhqQcZv9J908AfngNKULlVdLGHjNYppieMbZI- g_nt1we74IQN4sovhG156SrmzTZUou8vlxvHJfXNBt0XetPdKPUzYj6QHzrigB$ To modify your subscriptions, click here: g_nt1we74IQN4sovhG156SrmzTZUou8vlxvHJfXNBt0XetPdKPUzYj6RGP9gjE$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AhqQcZv9J908AfngNKULlVdLGHjNYppieMbZI- g_nt1we74IQN4sovhG156SrmzTZUou8vlxvHJfXNBt0XetPdKPUzYj6ZufDOoc$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office March 4, 2026 In reply refer to: Project No. 803-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:2025 Dam Safety Inspection Follow-up Dear Mr. Cruzen: This is in response to a letter dated January 28, 2026,from Mr. Robert Ellis that notified this office of completion of the follow-up items Nos. 3 and 4 from the 2025 annual dam safety inspection of Philbrook Main Dam and Round Valley Dam, which are parts of the DeSabla-Centerville Project, FERC No. 803. We have reviewed the submittal, and we have the following comment: 1.Your submittal provides “Photo 1: Cleared Radial Gate Spillway (Photographed October 2025)” to demonstrate the completion of follow-up item 3. However, Photo 1 shows the upstream side of the radial gate.Note that follow-up item 3 was intended for the downstream side of the radial gate spillway as discussed during the inspection. It appeared that riprap had shifted downwards into the channel. Provide an update that confirms the removal and/or restoration of the riprap or engineering justification that it will not impede design spillway discharge. 2.We concur that item No. 4 was adequately addressed. Within 45 days of the date of this letter, address our comment or provide a plan and schedule to address our comment. File your submittal using our eFiling system at https://www.ferc.gov/ferc-online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled.For assistance with eFiling,contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). Document Accession #: 20260304-3036 Filed Date: 03/04/2026 2 We appreciate your continued efforts in this aspect of our dam safety program. If you have any questions, contact Ms. Eunhye Kim at (415) 369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20260304-3036 Filed Date: 03/04/2026 Frank L Blackett Digitally signed by Frank L Blackett Date: 2026.03.04 08:35:57 -08'00' Document Content(s) P-803-000_107522_3-4_2025DSI FollowUp_compl.docx.pdf......................1 Document Accession #: 20260304-3036 Filed Date: 03/04/2026