Loading...
HomeMy WebLinkAbout03.02.26 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:BOS Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company Date:Monday, March 2, 2026 8:50:35 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, March 2, 2026 7:16 AM Subject: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 3/2/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits updated plan and schedule to address Action Item 2 from the 2025 Annual Dam Safety Inspection of the Grizzly Forebay Dam of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20260302-5041__;!!KNMwiTCp4spf!D- zpYOkLRQUPIkPcpXhE_2BscmDZ7_2jJ2WPD4AzzEJ4OKdTGPRzpVMpx5SDPDx20Ot9KXtMoolEl4NkrKSUKqsbPOMAFN4XiX- e$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!D- zpYOkLRQUPIkPcpXhE_2BscmDZ7_2jJ2WPD4AzzEJ4OKdTGPRzpVMpx5SDPDx20Ot9KXtMoolEl4NkrKSUKqsbPOMAFJbbTIeG$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!D- or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 February 27, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Grizzly Forebay Dam, NATDAM No. CA00333 2025 Annual FERC Inspection (Follow Up) – Plan and Schedule for Action Item 2 ENCLOSURE CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) updated plan and schedule to address Action Item 2 (I-2) from the 2025 annual Federal Energy Regulatory Commission (FERC) dam safety inspection of PG&E’s Bucks Creek Hydroelectric Project, FERC No. 619. I-2 is regarding Grizzly Forebay Dam. FERC completed the follow-up inspection of the project facilities with PG&E staff on August 29, 2025, as part of the 2025 Part 12D safety inspection. FERC provided I-2 to PG&E in a letter dated September 10, 2025. PG&E provided its plan and schedule to address I-2 in a letter to FERC dated October 20, 2025. PG&E's plan and schedule to address the action item is enclosed with this letter (Enclosure 1). Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762 -9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Plan and Schedule for Action Item from the 2025 Annual FERC Dam Safety Inspection Document Accession #: 20260302-5041 Filed Date: 03/02/2026 Document Content(s) PGE20260227_619_BucksCreek_GrizzlyFB_2025DSI_Ltr.pdf......................1 Document Accession #: 20260302-5041 Filed Date: 03/02/2026