Loading...
HomeMy WebLinkAbout02.27.26 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Cannon, Jamie; Loeser, Kamie Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company Date:Friday, February 27, 2026 8:52:54 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, February 27, 2026 5:26 AM Subject: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 2/26/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Drawing/Maps Description: Pacific Gas and Electric Company submits As-Built Site Plan Drawings for the Grizzly Forebay Recreation Area of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260226- 5315__;!!KNMwiTCp4spf!Gs2I7b902JN-tNvCK2vBkoRrMy- 9NzUfgul0w16VjXsb8MsfmajFmTGye8HlILt_IeIJ7bfEgV7r0FexeXM9INUu_t4X8cdStc7M$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Gs2I7b902JN- tNvCK2vBkoRrMy- 9NzUfgul0w16VjXsb8MsfmajFmTGye8HlILt_IeIJ7bfEgV7r0FexeXM9INUu_t4X8UZ59kNy$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Gs2I7b902JN- tNvCK2vBkoRrMy-9NzUfgul0w16VjXsb8MsfmajFmTGye8HlILt_IeIJ7bfEgV7r0FexeXM9INUu_t4X8RLkDyul$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 February 26, 2026 Via Electronic Submittal (E-File and Email) Debbie-Anne Reese, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Laura Schweitzer Forest Supervisor Plumas National Forest Laura.Schweitzer@usda.gov Re: Bucks Creek Hydroelectric Project, FERC No. 619-CA Submittal of As‑Built Site Plan Drawings – Grizzly Forebay Recreation Area Dear Secretary Reese and Supervisor Schweitzer: Pacific Gas and Electric Company (PG&E) is submitting as‑built site plan drawings for the Grizzly Forebay Recreation Area, which is part of the Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. State Water Resources Control Board (SWRCB) 401 Water Quality Certification (WQC) Condition 21 and U.S. Department of Agriculture, Forest Service’s (Forest Service) section 4(e) Condition No. 55 require the licensees implement the Bucks Creek Recreation Management Plan (RMP). This submittal fulfills the Recreation Management Plan requirement to update Attachment B (as‑built site plan drawings) following construction. The attached drawings update the R‑12 conceptual drawings to reflect the completed Grizzly Forebay Recreation Area improvements. Electronic copies are included with this filing, and hard copies will be provided to the U.S. Forest Service upon request. The U.S. Forest Service approved the project for construction on June 30, 2023, and FERC’s San Francisco Regional Office authorized the project on October 11, 2024. The enclosed R‑12 as‑built site plan drawings correspond to the work described in PG&E’s Brief Construction Report for the Grizzly Forebay Recreation Improvements, which was filed with FERC on February 13, 2026. For general questions regarding this filing, please contact Jamie Visinoni, License Project Manager for PG&E, at (530) 215‑6676. Sincerely, Matthew Joseph Supervisor, Hydro Licensing Enclosure: 1. As‑Built Site Plan Drawings R-12 – Grizzly Forebay Recreation Area cc: See Attached List Document Accession #: 20260226-5315 Filed Date: 02/26/2026 Debbie Anne-Reese, Secretary and Supervisor Schweitzer February 26, 2026 Page 2 cc: via email w/enclosure Kurt Sable (Forest Service) – kurt.sable@usda.gov Dawn Alvarez (Forest Service) – dawn.alvarez@usda.gov Erika Brenzovich (Forest Service) – Erika.brenzovich@usda.gov Colleen Heard (Forest Service) – colleen.heard@usda.gov Document Accession #: 20260226-5315 Filed Date: 02/26/2026 ENCLOSURE 1 Document Accession #: 20260226-5315 Filed Date: 02/26/2026 OLD ROAD BED GRIZZLY FOREBAY RESTROOM STAIRS RESTROOM TRAIL TO GRIZZLY FOREBAY CAMPGROUND GRIZZLY FOREBAY TRAIL BOAT LAUNCH ASPHALT PARKING AREA STAIRS HELISPOT 1" = 30' feet 6030300 scale TRAIL WATER BODY TREE CANOPY ENTRANCE SIGN SITE ENTRANCE 1020 FT. Grizzly Forebay Recreation Area BUCKS CREEK PROJECT FERC NO. 619 EXHIBIT R-12 LEGEND Document Accession #: 20260226-5315 Filed Date: 02/26/2026 Document Content(s) PGE20260226_619_Grizzly_Forebay_RecreationArea_AsBuilt.pdf ...............1 Document Accession #: 20260226-5315 Filed Date: 02/26/2026