HomeMy WebLinkAbout02.25.26 Board Correspondence - FW_ General Correspondence issued in FERC P-2107-000From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter,
Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Cannon, Jamie
Subject:Board Correspondence - FW: General Correspondence issued in FERC P-2107-000
Date:Wednesday, February 25, 2026 9:00:50 AM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Wednesday, February 25, 2026 8:56 AM
Subject: General Correspondence issued in FERC P-2107-000
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 2/25/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-2107-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: General Correspondence
Description: Letter to Pacific Gas and Electric Company discussing the 02/11/2026 Final Construction Report for replacing the hoist and controls for the radial bypass gate at the Poe
Dam, part of the Poe Hydroelectric Project under P-2107.
To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260225-
3059__;!!KNMwiTCp4spf!AWkn0vjGEgWhGj_uUO_yV0DnnIxqUUwrxXf7WaXoHsv2HgklYd3417es7vcFY9bm-0VVzkbJf6RFi1GEkS4vkjOQ2oHK3OsnqD4_$
To modify your subscriptions, click here:
0VVzkbJf6RFi1GEkS4vkjOQ2oHK3ApsqIh8$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AWkn0vjGEgWhGj_uUO_yV0DnnIxqUUwrxXf7WaXoHsv2HgklYd3417es7vcFY9bm-
0VVzkbJf6RFi1GEkS4vkjOQ2oHK3G5Ld1Px$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections –San Francisco Regional Office
February 25, 2026
In reply refer to:
Project No. 2107-CA
VIA FERC Service
Mr. Russell Cruzen, P.E., Director
Power Generation, Asset Excellence
Pacific Gas and Electric Company
300 Lakeside Dr.
Oakland, CA 94612-3534
Re:Radial Bypass Gate Hoist and Controls –Final Construction Report
Dear Mr. Cruzen:
This is in response to a letter dated February 11, 2026 from Mr. Joseph Landucci
that submitted the final construction report for replacing the hoist and controls for the
radial bypass gate at Poe Dam, which is part of the Poe Hydroelectric Project, FERC
No.2107. We have reviewed the submittal, and have no comments.
We appreciate your continued efforts in this aspect of our dam safety program.If
you have questions, contact Ms. Eunhye Kim at (415)369-3321.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer
Document Accession #: 20260225-3059 Filed Date: 02/25/2026
Frank L Blackett Digitally signed by Frank L Blackett
Date: 2026.02.25 08:18:18 -08'00'
Document Content(s)
P-2107-000_108282_Const_Poe_Hoist_FCR.docx.pdf ...........................1
Document Accession #: 20260225-3059 Filed Date: 02/25/2026