Loading...
HomeMy WebLinkAbout02.25.26 Board Correspondence - FW_ General Correspondence issued in FERC P-2107-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: General Correspondence issued in FERC P-2107-000 Date:Wednesday, February 25, 2026 9:00:50 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, February 25, 2026 8:56 AM Subject: General Correspondence issued in FERC P-2107-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 2/25/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-2107-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: General Correspondence Description: Letter to Pacific Gas and Electric Company discussing the 02/11/2026 Final Construction Report for replacing the hoist and controls for the radial bypass gate at the Poe Dam, part of the Poe Hydroelectric Project under P-2107. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260225- 3059__;!!KNMwiTCp4spf!AWkn0vjGEgWhGj_uUO_yV0DnnIxqUUwrxXf7WaXoHsv2HgklYd3417es7vcFY9bm-0VVzkbJf6RFi1GEkS4vkjOQ2oHK3OsnqD4_$ To modify your subscriptions, click here: 0VVzkbJf6RFi1GEkS4vkjOQ2oHK3ApsqIh8$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AWkn0vjGEgWhGj_uUO_yV0DnnIxqUUwrxXf7WaXoHsv2HgklYd3417es7vcFY9bm- 0VVzkbJf6RFi1GEkS4vkjOQ2oHK3G5Ld1Px$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office February 25, 2026 In reply refer to: Project No. 2107-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Radial Bypass Gate Hoist and Controls –Final Construction Report Dear Mr. Cruzen: This is in response to a letter dated February 11, 2026 from Mr. Joseph Landucci that submitted the final construction report for replacing the hoist and controls for the radial bypass gate at Poe Dam, which is part of the Poe Hydroelectric Project, FERC No.2107. We have reviewed the submittal, and have no comments. We appreciate your continued efforts in this aspect of our dam safety program.If you have questions, contact Ms. Eunhye Kim at (415)369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20260225-3059 Filed Date: 02/25/2026 Frank L Blackett Digitally signed by Frank L Blackett Date: 2026.02.25 08:18:18 -08'00' Document Content(s) P-2107-000_108282_Const_Poe_Hoist_FCR.docx.pdf ...........................1 Document Accession #: 20260225-3059 Filed Date: 02/25/2026