Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Wednesday, February 25, 2026 9:16 AM
Subject: Delegated Order issued in FERC P-803-000
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 2/25/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Delegated Order
Description: Letter to Pacific Gas and Electric Company granting the 02/19/26 request for an extension of time to submit a Final Construction Report for the Oro Fino underground alignment near DeSabla Forebay Dam, part of
the DeSabla-Centerville Project under P-803.
To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260225-
3069__;!!KNMwiTCp4spf!DxwNkCj7Rmd28wJHDAQj94vRa5OUzJQwQactdstvQXrFcc3e1gVgzaZNirD3o3CK5qYpSlvKqDJ6AU6ssq2C1d77I6_pe-KWpmfB$
To modify your subscriptions, click here:
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DxwNkCj7Rmd28wJHDAQj94vRa5OUzJQwQactdstvQXrFcc3e1gVgzaZNirD3o3CK5qYpSlvKqDJ6AU6ssq2C1d77I6_pe9a7lHCH$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections –San Francisco Regional Office
February 25, 2026
In reply refer to:
Project No. 803-CA
VIA FERC Service
Mr. Russell Cruzen, P.E., Director
Power Generation, Asset Excellence
Pacific Gas and Electric Company
300 Lakeside Dr.
Oakland, CA 94612-3534
Re:Final Construction Report for Oro Fino Underground Alignment
Dear Mr. Cruzen:
This is in response to a letter dated February 19, 2026 from Mr. Joseph Landucci
that submitted a request for an extension of time to submit a final construction report for
the Oro Fino underground alignment near DeSabla Forebay Dam, which is part of the
DeSabla-Centerville Project, FERC No. 803.We have reviewed the proposed extension
of time and grant the request to submit a final construction report by May 30, 2026.
File your submittal using our eFiling system at https://www.ferc.gov/ferc-
online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional
Office from the eFiling menu. The cover page of the filing must indicate that the
material was eFiled. For assistance with eFiling, contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY).
We appreciate your continued efforts in this aspect of our dam safety program. If
you have any questions, contact Ms. Eunhye Kim at (415)369-3321.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer
Document Accession #: 20260225-3069 Filed Date: 02/25/2026
Frank L Blackett Digitally signed by Frank L Blackett
Date: 2026.02.25 08:40:09 -08'00'
Document Content(s)
P-803-000_108441_Oro Fino Undergrounding_FCR EOT.docx.pdf.................1
Document Accession #: 20260225-3069 Filed Date: 02/25/2026