HomeMy WebLinkAbout02.25.26 Board Correspondence - FW_ Delegated Order issued in FERC P-619-000From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod;
Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.;
Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Cannon, Jamie
Subject:Board Correspondence - FW: Delegated Order issued in FERC P-619-000
Date:Wednesday, February 25, 2026 9:06:52 AM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Wednesday, February 25, 2026 9:06 AM
Subject: Delegated Order issued in FERC P-619-000
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
On 2/25/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Delegated Order
Description: Letter to Pacific Gas and Electric Company accepting the 06/16/2025 plan and schedule to address
Comments 1 through 8 by 06/30/2026 re the Three Lakes Dam et al., parts of the Bucks Creek Project under P-619.
To view the document for this Issuance, click here
https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260225-
3062__;!!KNMwiTCp4spf!APJDUe0u-0pM48RzkFMirGNfwk_ivG5Fplho-eUrb-
7jl1goTbKy6K9xpidE4ODD6YiDf0sie4DhFXb6KEwvTyXikcwdKZF5Lkdw$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!APJDUe0u-
0pM48RzkFMirGNfwk_ivG5Fplho-eUrb-
7jl1goTbKy6K9xpidE4ODD6YiDf0sie4DhFXb6KEwvTyXikcwdKZmTZGR-$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!APJDUe0u-
0pM48RzkFMirGNfwk_ivG5Fplho-eUrb-
7jl1goTbKy6K9xpidE4ODD6YiDf0sie4DhFXb6KEwvTyXikcwdKQ_2x-n4$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections –San Francisco Regional Office
February 25, 2026
In reply refer to:
Project No. 619-CA
VIA FERC Service
Mr. Russell Cruzen, P.E., Director
Power Generation, Asset Excellence
Pacific Gas and Electric Company
300 Lakeside Dr.
Oakland, CA 94612-3534
Re:Response to FERC Comments 1 through 8
Dear Mr. Cruzen:
This is in response to a letter dated June 16, 2025 from Mr. Robert Ellis that
submitted a response to our comments on the 2021 Emergency Action Plan (EAP)
Reprint for Three Lakes Dam, Bucks Lake Dam, Lower Bucks Lake Dam, and Grizzly
Forebay Dam, which are parts of the Bucks Creek Project, FERC No. 619.Your plan
and schedule to address comments 1 through 8 (C-1 through C-8)by June 30, 2026,is
acceptable.
File your submittal using our eFiling system at https://www.ferc.gov/ferc-
online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional
Office from the eFiling menu. The cover page of the filing must indicate that the
material was eFiled. For assistance with eFiling, contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY).
We appreciate your cooperation in this aspect of our public safety program. If you
have any questions, contact Ms. Eunhye Kim at (415)369-3321.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer
Document Accession #: 20260225-3062 Filed Date: 02/25/2026
Frank L Blackett Digitally signed by Frank L Blackett
Date: 2026.02.25 08:24:41 -08'00'