Loading...
HomeMy WebLinkAbout02.25.26 Board Correspondence - FW_ Delegated Order issued in FERC P-619-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Delegated Order issued in FERC P-619-000 Date:Wednesday, February 25, 2026 9:06:52 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, February 25, 2026 9:06 AM Subject: Delegated Order issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 2/25/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Delegated Order Description: Letter to Pacific Gas and Electric Company accepting the 06/16/2025 plan and schedule to address Comments 1 through 8 by 06/30/2026 re the Three Lakes Dam et al., parts of the Bucks Creek Project under P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260225- 3062__;!!KNMwiTCp4spf!APJDUe0u-0pM48RzkFMirGNfwk_ivG5Fplho-eUrb- 7jl1goTbKy6K9xpidE4ODD6YiDf0sie4DhFXb6KEwvTyXikcwdKZF5Lkdw$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!APJDUe0u- 0pM48RzkFMirGNfwk_ivG5Fplho-eUrb- 7jl1goTbKy6K9xpidE4ODD6YiDf0sie4DhFXb6KEwvTyXikcwdKZmTZGR-$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!APJDUe0u- 0pM48RzkFMirGNfwk_ivG5Fplho-eUrb- 7jl1goTbKy6K9xpidE4ODD6YiDf0sie4DhFXb6KEwvTyXikcwdKQ_2x-n4$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office February 25, 2026 In reply refer to: Project No. 619-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Response to FERC Comments 1 through 8 Dear Mr. Cruzen: This is in response to a letter dated June 16, 2025 from Mr. Robert Ellis that submitted a response to our comments on the 2021 Emergency Action Plan (EAP) Reprint for Three Lakes Dam, Bucks Lake Dam, Lower Bucks Lake Dam, and Grizzly Forebay Dam, which are parts of the Bucks Creek Project, FERC No. 619.Your plan and schedule to address comments 1 through 8 (C-1 through C-8)by June 30, 2026,is acceptable. File your submittal using our eFiling system at https://www.ferc.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your cooperation in this aspect of our public safety program. If you have any questions, contact Ms. Eunhye Kim at (415)369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20260225-3062 Filed Date: 02/25/2026 Frank L Blackett Digitally signed by Frank L Blackett Date: 2026.02.25 08:24:41 -08'00' Document Content(s) P-619-000_91732_c1-c8_Bucks 2021EAP_reprints_ps.docx.pdf .................1 Document Accession #: 20260225-3062 Filed Date: 02/25/2026