HomeMy WebLinkAbout01.26.26 Board Correspondence - FW_ Delegated Order issued in FERC P-803-000From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod;
Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.;
Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Nuzum, Danielle; Loeser, Kamie
Subject:Board Correspondence - FW: Delegated Order issued in FERC P-803-000
Date:Monday, January 26, 2026 9:38:22 AM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Monday, January 26, 2026 8:46 AM
Subject: Delegated Order issued in FERC P-803-000
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
On 1/26/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Delegated Order
Description: Letter to Pacific Gas and Electric Company granting the 12/24/2025 request for an extension of time
to submit a Final Construction Report for repairing the spillway at the Hendricks Head Dam, part of the DeSabla-
Centerville Project under P-803.
To view the document for this Issuance, click here
https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260126-
3033__;!!KNMwiTCp4spf!AF37a1p-i8HfIMTVP5OJZ9br-
zRnT_tUvve2QiCk_4Rt05Qj7byKgdoBChgMdYThrjCUz713ZZ0p44PaQxue6JTBqCcTpRx8lKr1$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!AF37a1p-
i8HfIMTVP5OJZ9br-
zRnT_tUvve2QiCk_4Rt05Qj7byKgdoBChgMdYThrjCUz713ZZ0p44PaQxue6JTBqCcTpfkj44YA$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AF37a1p-
i8HfIMTVP5OJZ9br-
zRnT_tUvve2QiCk_4Rt05Qj7byKgdoBChgMdYThrjCUz713ZZ0p44PaQxue6JTBqCcTpeRNqGkF$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections –San Francisco Regional Office
January 26, 2026
In reply refer to:
Project No. 803-CA
VIA FERC Service
Mr. Russell Cruzen, P.E., Director
Power Generation, Asset Excellence
Pacific Gas and Electric Company
300 Lakeside Dr.
Oakland, CA 94612-3534
Re:Extension of Time Request for Final Construction Report for Spillway Repair for
Hendricks Head Dam
Dear Mr.Cruzen:
This is in response to a letter dated December 24, 2025,from Mr. Robert Ellis that
submitted a request for an extension of time to submit a final construction report for
repairing the spillway at Hendricks Head Dam,which is part of the DeSabla-Centerville
Project, FERC No. 803.We have reviewed your proposed extension of time and grant
your request to submit the final construction report by March 31, 2027. You are
reminded to include the construction completion date (day, month, and year) in future
extension of time requests.
File your submittal using our eFiling system at https://www.ferc.gov/ferc-
online/overview.When eFiling, select Hydro: Dam Safety and San Francisco Regional
Office from the eFiling menu.The cover page of the filing must indicate that the
material was eFiled.For assistance with eFiling, contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY).
We appreciate your continued efforts in this aspect of our dam safety program. If
you have any questions, contact Ms. Eunhye Kim at (415) 369-3321.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer
Document Accession #: 20260126-3033 Filed Date: 01/26/2026
Frank L Blackett Digitally signed by Frank L Blackett
Date: 2026.01.26 08:00:17 -08'00'
Document Content(s)
P-803-000_105508_Hendricks Head Spllwy Repair_EOT.docx.pdf ...............1
Document Accession #: 20260126-3033 Filed Date: 01/26/2026