Loading...
HomeMy WebLinkAbout01.22.26 Board Correspondence - FW_ General Correspondence issued in FERC P-2088-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: General Correspondence issued in FERC P-2088-000 Date:Friday, January 23, 2026 11:24:09 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, January 22, 2026 1:16 PM Subject: General Correspondence issued in FERC P-2088-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 1/22/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-2088-000 Lead Applicant: South Feather Water & Power Agency Filing Type: General Correspondence Description: Letter to South Feather Water and Power Agency discussing the 11/28/2022 Twelfth Independent Consultant's Safety Inspection Report for the Miner's Ranch Dam, part of the South Feather Hydroelectric Project under P-2088. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260122- 3110__;!!KNMwiTCp4spf!En- WxtV8B2wb5GO8isppOLBh0vBYeMZpG9YK1an589OXag1C2fWpvBdXUMTrTDM9u8W7L08M12qcU- Nit3uPh9gAaRL9IFAEQYB6$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!En- WxtV8B2wb5GO8isppOLBh0vBYeMZpG9YK1an589OXag1C2fWpvBdXUMTrTDM9u8W7L08M12qcU- Nit3uPh9gAaRL9IIYtcyog$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!En- WxtV8B2wb5GO8isppOLBh0vBYeMZpG9YK1an589OXag1C2fWpvBdXUMTrTDM9u8W7L08M12qcU- Nit3uPh9gAaRL9IJ5C2hUI$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office January 22, 2026 In reply refer to: Project No. 2088-CA VIA FERC Service Mr. Rath Moseley General Manager South Feather Water and Power Agency 2310 Oro-Quincy Highway Oroville, CA 95965 Re:Twelfth Independent Consultant’s Safety Inspection Report for Miner’s Ranch Dam Dear Mr. Moseley: This is in response to a letter dated November 28, 2022,from Ms. Kristen McKillop that submitted the Twelfth Independent Consultant’s Safety Inspection Report (Part 12D report) for Miner’s Ranch Dam, which is part of the South Feather Hydroelectric Project, FERC No. 2088. Our review of the document concludes that the scope and content of the report satisfies the requirements of Part 12, Subpart D, §12.37 of Title 18 of the Code of Federal Regulations.The Part 12D Report was found to be prepared in general accordance with the Engineering Guidelines Chapter 14 outline provided in our reminder letter dated August 19, 2021.We have no comments. We appreciate your cooperation in this aspect of our dam safety program. If you have any questions, please contact Mr.Cody Stephenson at (415)369-3308 . Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20260122-3110 Filed Date: 01/22/2026 Frank L Blackett Digitally signed by Frank L Blackett Date: 2026.01.22 12:30:35 -08'00' Document Content(s) P-2088 MRD 2022 12th Part 12D letter.docx.pdf.............................1 Document Accession #: 20260122-3110 Filed Date: 01/22/2026