Loading...
HomeMy WebLinkAbout01.22.26 Board Correspondence - FW_ Compliance Directives issued in FERC P-803-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-803-000 Date:Thursday, January 22, 2026 8:13:01 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, January 22, 2026 6:36 AM Subject: Compliance Directives issued in FERC P-803-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 1/22/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Compliance Directives General Correspondence Description: Letter in response to filing of Part 12D Inspection Plan for the 2026 Periodic Inspection of the Round Valley Dam Project, under P-803. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20260122-3015__;!!KNMwiTCp4spf!A- sk5ZArQKwEnEdVEYmwroX1nRYslebBYITm7j_GBEKHylKpMChJSYu6UWLbUB9QYkPXJPhkC_f6EJwpoteuRLosMyx0iSuV4GD- $ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!A- ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!A- or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections 888 First Street, NE Routing Code: PJ-13 Washington, DC 20426 (202) 502-6314 Office January 22, 2026 In reply refer to: Project No. 803-01-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Subject: Part 12D Inspection Plans and Independent Consultant (IC) Team Proposal, 2026 Periodic Inspection, Round Valley Dam Dear Mr. Cruzen: Your letter dated December 18, 2025, transmitted the 2026 Periodic Inspection (PI) Part 12D Inspection Plan for Round Valley Dam, FERC No. 803-01. We have reviewed the Inspection Plan and have the following comments: 1. The resume provided for the proposed IC, Dr. Christopher Hunt demonstrates that he fulfills the requirements of 18 CFR § 12.31(a) and has the appropriate experience and expertise to serve in the proposed role of IC. 2. The resume provided for the proposed IC Team member, Dr. Kathleen Darby, demonstrates that she fulfills the requirements of 18 CFR § 12.31(b) and has the appropriate experience and expertise to serve in the proposed role as a Project Engineer and Inspection Team Member. 3. The Inspection Plan proposes Messrs. Rick Poeppelman, Alex Greene, James Barbis and Dr. Christie Hale as subject matter experts and they will not participate in the Inspection. Therefore, they are considered as support staff to the IC as opposed to an IC Team member as defined in 18 CFR § 12.31(b) and does not require our approval. Document Accession #: 20260122-3015 Filed Date: 01/22/2026 2 4. Table 6 of the Inspection Plan identified Structural, Hydrology and Hydraulics, Gates, and Geology as required technical disciplines. Some aspects of these disciplines can be performed by the identified supporting team members; however, other aspects of these disciplines must be represented by the IC Team members performing the site inspection. Drs. Hunt and Darby are the only two IC Team members and the only two individuals identified as participating in the site inspection. The resumes for Drs. Hunt and Darby do not demonstrate or document their project experience inspecting spillways or outlet works (structural, hydrology and hydraulics, and gate technical disciplines). Provide a revised Inspection Plan that documents Dr. Hunt’s and/or Dr. Darby’s project experience inspecting spillways or outlet works or provide the name and resume of an additional IC Team member(s) that will provide this expertise for the site inspection. Per 18 CFR § 12.34(a), you are required to obtain the approval of the IC Team from the Director, Division of Dam Safety and Inspections, prior to the performance of this Periodic Inspection. For the reasons listed above in comment, we are unable to approve the IC Team or the Inspection Plan. Within 30 days of the date of this letter, provide a revised Inspection Plan that addresses the comments above. File your submittal using our eFiling system at https://www.ferc.gov/ferc-online/overview. During eFiling make the following menu selections: Hydro: Dam Safety; Washington, DC; and Independent Consultant Approval Request. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). Thank you for your continued cooperation and interest in dam safety. If you have any questions, please contact me at (202) 502-8104 or vishnu.vishnukanthan@ferc.gov. Sincerely, Vishnu K. Vishnukanthan, P.E. Senior Civil Engineer Division of Dam Safety and Inspections Document Accession #: 20260122-3015 Filed Date: 01/22/2026 VISHNU VISHNUKANTHAN Digitally signed by VISHNU VISHNUKANTHAN Date: 2026.01.22 08:53:59 -05'00' Document Content(s) P-803 Round Valley PI Plan Review.pdf.....................................1 Document Accession #: 20260122-3015 Filed Date: 01/22/2026