HomeMy WebLinkAbout01.16.26 Board Correspondence - FW_ Progress Report submitted in FERC P-2107-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter,
Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Nuzum, Danielle
Subject:Board Correspondence - FW: Progress Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company
Date:Friday, January 16, 2026 2:54:00 PM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Friday, January 16, 2026 1:46 PM
Subject: Progress Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 1/16/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-2107-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Progress Report
Description: Pacific Gas and Electric Company submits Final Construction Report re installation of a bypass gate bulkhead at the Poe Dam of the Poe Hydroelectric Project under P-
2107.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260116-
5167__;!!KNMwiTCp4spf!HszlW0faWQkoUUESJqS3XcfVHP9U_qbr2OauVvKWnpe22k2X5AEJtHJ4LzXmaE-4iQiwJHrbM20OGixaPdH-5eRym5bTnh0cSy-6$
To modify your subscriptions, click here:
4iQiwJHrbM20OGixaPdH-5eRym5bTnmp7NSrN$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HszlW0faWQkoUUESJqS3XcfVHP9U_qbr2OauVvKWnpe22k2X5AEJtHJ4LzXmaE-
4iQiwJHrbM20OGixaPdH-5eRym5bTnlDKJoeI$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
January 16, 2026
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Poe Hydroelectric Project, FERC No. 2107-CA
Poe Dam, NATDAM No. CA00328
Bypass Gate Bulkhead– Final Construction Report
ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents Pacific Gas and Electric Company’s (PG&E) final construction report
for the installation of the bypass gate cofferdam at Poe Dam, which is part of PG&E’s Poe
Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 2107 . In a
letter dated November 8, 2024, FERC authorized PG&E to proceed with the project and
requested that PG&E file a final construction report for the project within 90 days of
construction completion, or by March 31, 2026. The construction project was completed on
October 24, 2025.
(Enclosure 1) of this letter provides the final construction report, which includes the as-built
drawings and construction certifications as appendices.
Should you have technical questions concerning this matter, please contact Gavin
Rhoads, project engineer for PG&E, at (530) 370 -6685. For general questions, please
contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Joseph Landucci
Manager, Power Generation Project Engineering
Enclosure: CUI//CEII – DO NOT RELEASE
1. Poe Dam Install Bypass Gate Bulkhead – Final Construction Report, prepared by
PG&E and dated January 2026
Document Accession #: 20260116-5167 Filed Date: 01/16/2026
Document Content(s)
PGE20260116_2107_Poe_BypassGteCofferdam_ConstRpt_Ltr.pdf .................1
Document Accession #: 20260116-5167 Filed Date: 01/16/2026