HomeMy WebLinkAbout01.16.26 Board Correspondence - FW_ Progress Report submitted in FERC P-2107-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Progress Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company Date:Friday, January 16, 2026 2:54:00 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, January 16, 2026 1:46 PM Subject: Progress Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 1/16/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-2107-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Progress Report Description: Pacific Gas and Electric Company submits Final Construction Report re installation of a bypass gate bulkhead at the Poe Dam of the Poe Hydroelectric Project under P- 2107. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260116- 5167__;!!KNMwiTCp4spf!HszlW0faWQkoUUESJqS3XcfVHP9U_qbr2OauVvKWnpe22k2X5AEJtHJ4LzXmaE-4iQiwJHrbM20OGixaPdH-5eRym5bTnh0cSy-6$ To modify your subscriptions, click here: 4iQiwJHrbM20OGixaPdH-5eRym5bTnmp7NSrN$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HszlW0faWQkoUUESJqS3XcfVHP9U_qbr2OauVvKWnpe22k2X5AEJtHJ4LzXmaE- 4iQiwJHrbM20OGixaPdH-5eRym5bTnlDKJoeI$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 January 16, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Poe Hydroelectric Project, FERC No. 2107-CA Poe Dam, NATDAM No. CA00328 Bypass Gate Bulkhead– Final Construction Report ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) final construction report for the installation of the bypass gate cofferdam at Poe Dam, which is part of PG&E’s Poe Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 2107 . In a letter dated November 8, 2024, FERC authorized PG&E to proceed with the project and requested that PG&E file a final construction report for the project within 90 days of construction completion, or by March 31, 2026. The construction project was completed on October 24, 2025. (Enclosure 1) of this letter provides the final construction report, which includes the as-built drawings and construction certifications as appendices. Should you have technical questions concerning this matter, please contact Gavin Rhoads, project engineer for PG&E, at (530) 370 -6685. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Joseph Landucci Manager, Power Generation Project Engineering Enclosure: CUI//CEII – DO NOT RELEASE 1. Poe Dam Install Bypass Gate Bulkhead – Final Construction Report, prepared by PG&E and dated January 2026 Document Accession #: 20260116-5167 Filed Date: 01/16/2026 Document Content(s) PGE20260116_2107_Poe_BypassGteCofferdam_ConstRpt_Ltr.pdf .................1 Document Accession #: 20260116-5167 Filed Date: 01/16/2026