Loading...
HomeMy WebLinkAbout01.16.26 Board Correspondence - FW_ Compliance Directives issued in FERC P-2088-0003From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Nuzum, Danielle; Loeser, Kamie Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-2088-000 Date:Friday, January 16, 2026 2:53:41 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, January 16, 2026 1:06 PM Subject: Compliance Directives issued in FERC P-2088-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 1/16/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-2088-000 Lead Applicant: South Feather Water & Power Agency Filing Type: Compliance Directives General Correspondence Description: Letter to South Feather Water and Power Agency providing a comment on the 12th Independent Consultant's Safety Inspection Report for the Little Grass Valley Dam Project under P-2088. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260116- 3089__;!!KNMwiTCp4spf!Hu-ihottHjNmQIEJLhzb_jW9- 6wu4bdrXhdBXj2S8FEffvnEERuAFS5T4GdzTHTKauUK6lgqwiDVUidbg744t3eL07Iu88KctGNc$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Hu- ihottHjNmQIEJLhzb_jW9- 6wu4bdrXhdBXj2S8FEffvnEERuAFS5T4GdzTHTKauUK6lgqwiDVUidbg744t3eL07Iu80YpgwIX$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Hu- ihottHjNmQIEJLhzb_jW9- 6wu4bdrXhdBXj2S8FEffvnEERuAFS5T4GdzTHTKauUK6lgqwiDVUidbg744t3eL07Iu8-BiYbku$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office January 16, 2026 In reply refer to: Project No. 2088-CA VIA FERC Service Mr. Rath Moseley General Manager South Feather Water and Power Agency 2310 Oro-Quincy Highway Oroville, CA 95965 Re:12th Independent Consultant’s Safety Inspection Report for Little Grass Valley Dam Dear Mr.Moseley: This is in response to a letter dated January 27, 2023,from Ms. Kristen Mackillop that submitted the 12th Independent Consultants’ (ICs’)Safety Inspection Report (Part 12D report) for Little Grass Valley Dam, which is part of the South Feather Water and Power Agency, FERC Project No. 2088. Our review of the document concludes that the scope and content of the report satisfies the requirements of Part 12, Subpart D, §12.37 of Title 18 of the Code of Federal Regulations.The Part 12D Report was found to be prepared in general accordance with the Engineering Guidelines Chapter 14 and we have the following comment: Regarding seismicity at Little Grass Valley Dam: In the Part 12D report the ICs’ observed that, based on STID Section 5, the most recent complete deterministic ground motions are from a 2007 report which utilizes 1997 attenuation relationships. Note that as part of the 2012 Part 12D Reports (including Little Grass Valley Dam) the ICs updated Section 5 of the STIDs using the Next Generation Attenuation (NGA) 2008 relationships, which superseded the referenced 2007 estimates. It is not clear when or why those updates have been removed or lost. Explain why the 2012 updates are no longer needed, or revise Section 5 to ensure those results are re-added.Note that this issue should be checked for the other project STIDs (unless they have more recent updates). Within 30 days of the date of this letter provide a response to our comment or a plan and schedule for doing so. File your submittal using our eFiling system at https://www.ferc.gov/ferc-online/overview. When eFiling, select Hydro: Dam Safety; San Document Accession #: 20260116-3089 Filed Date: 01/16/2026 2 Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3376 (toll free), or (202) 502-8659 (TTY). We appreciate your cooperation in this aspect of our dam safety program. If you have any questions, please contact Mr. Cody Stephenson at (415)369-3310. Sincerely, Frank L. Blackett, P.E. Regional Engineer cc: Erik Malvick -Division Manager CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001 c/o Shawn.Jones@water.ca.gov Document Accession #: 20260116-3089 Filed Date: 01/16/2026 Frank L Blackett Digitally signed by Frank L Blackett Date: 2026.01.16 12:15:02 -08'00' Document Content(s) P-2088 LGVD 2022 12th Part 12D - letter.docx.pdf .........................1 Document Accession #: 20260116-3089 Filed Date: 01/16/2026