Loading...
HomeMy WebLinkAbout01.15.26 Board Correspondence - FW_ Compliance Directives issued in FERC P-2088-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-2088-000 Date:Friday, January 16, 2026 2:50:41 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, January 16, 2026 6:46 AM Subject: Compliance Directives issued in FERC P-2088-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 1/16/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-2088-000 Lead Applicant: South Feather Water & Power Agency Filing Type: Compliance Directives General Correspondence Delegated Order Description: Letter in response to filing of the revised Part 12D Inspection Plan and Independent Consultant's Team Proposal for the 2026 Comprehensive Assessment of Miners Ranch Development of the South Feather Power Project, under P-2088. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260116- 3017__;!!KNMwiTCp4spf!B-3zePH-378SSlGRKf57KL3OncHp4zQHviUE8nAKJsELQ5dgVvp5- LqgVUU5HgsOg9V3EIu16JtfKwdx1mbB6OGo9oZy5ShPjidz$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!B-3zePH- 378SSlGRKf57KL3OncHp4zQHviUE8nAKJsELQ5dgVvp5- LqgVUU5HgsOg9V3EIu16JtfKwdx1mbB6OGo9oZy5XKMoFe_$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!B-3zePH- 378SSlGRKf57KL3OncHp4zQHviUE8nAKJsELQ5dgVvp5- LqgVUU5HgsOg9V3EIu16JtfKwdx1mbB6OGo9oZy5a5ThOxS$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections 888 First Street, NE Routing Code: PJ-13 Washington, DC 20426 (202) 502-6314 Office January 16, 2026 In reply refer to: P-2088 VIA FERC Service Mr. Rath Moseley General Manager South Feather Water & Power Agency 2310 Oro-Quincy Hwy Oroville, CA 95966-5226 Subject: Revised Part 12D Inspection Plan and IC Team Proposal, 2026 Comprehensive Assessment, Miners Ranch Development Dear Mr. Moseley: Ms. Kristen McKillop filed a January 5, 2026, letter transmitting the revised Part 12D Inspection Plan and Independent Consultant Team (IC Team) proposal (collectively, the Inspection Plan) for the 2026 Comprehensive Assessment (CA) of Miners Ranch Development of South Feather Power Project, FERC No. 2088. We have reviewed the Inspection Plan and find that the additional information adequately addresses the comments in our December 12, 2025, letter. As stated in our December 12, 2025, letter, the resume for Mr. Craig Hall demonstrates that he fulfills the requirements of 18 CFR § 12.31(a), has the appropriate experience and expertise for the project features and type of inspection, and he is accepted to serve in the role as IC for this project. The resumes provided for Mr. Nick Oettle, Ms. Ashley Hase and Mr. Caleb Stewart also demonstrate that they meet the requirements of 18 CFR § 12.31(b) and have the appropriate experience and expertise to serve as SMEs on the IC Team for the type of inspection and project features identified. Per 18 CFR § 12.34(a), you are required to obtain the approval of the IC Team, and the facilitator for the PFMA/L2RA from the Director, Division of Dam Safety and Inspections, prior to the performance of this CA. Our December 12, 2025, letter provided this approval for the PFMA/L2RA facilitator, Mr. Matthew Farren. This letter constitutes approval of the IC Team (Mr. Hall, Mr. Oettle, Ms. Hase and Mr. Stewart), and the Document Accession #: 20260116-3017 Filed Date: 01/16/2026 2 Inspection Plan by the Director, Dam Safety and Inspections. No response is required to this letter; the Pre-Inspection Preparation Report (PIPR) is the next submittal due for this CA. The PIPR must be submitted at least 30 days in advance of the first IC Team activity as described in 18 CFR § 12.42, which makes it due no later than May 10, 2026. You may submit the PIPR earlier than that, if desired. File your submittal using the Commission’s eFiling system at https://www.ferc.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety and San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208- 3676 (toll free), or (202) 502-8659 (TTY). Thank you for your continued cooperation and interest in dam safety. If you have any questions, please contact me at (202) 502-8486 or yilak.desta@ferc.gov. Sincerely, Yilak Desta, P.E. Civil Engineer Division of Dam Safety and Inspections Document Accession #: 20260116-3017 Filed Date: 01/16/2026 YILAK DESTA Digitally signed by YILAK DESTA Date: 2026.01.16 08:42:19 -05'00' Document Content(s) P-2088 Miners Ranch Rev CA Plan Review.pdf................................1 Document Accession #: 20260116-3017 Filed Date: 01/16/2026