HomeMy WebLinkAbout01.14.26 Board Correspondence - FW_ General Correspondence issued in FERC P-96-000,et al.From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater,
Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth;
Loeser, Kamie
Cc:Nuzum, Danielle
Subject:Board Correspondence - FW: General Correspondence issued in FERC P-96-000,et al.
Date:Wednesday, January 14, 2026 4:34:10 PM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Wednesday, January 14, 2026 8:07 AM
Subject: General Correspondence issued in FERC P-96-000,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on
links, or replying..
On 1/14/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-96-000
P-137-000
P-175-000
P-233-000
P-606-000
P-619-000
P-803-000
P-1061-000
P-1121-000
P-1354-000
P-1962-000
P-1988-000
P-2105-000
P-2106-000
P-2130-000
P-2310-000
P-2661-000
P-2687-000
P-2735-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: General Correspondence
Description: Letter to Pacific Gas and Electric Company providing a comment on the 2026 planned outage schedule for the Kerckhoff
Project et al. under P-96 et al.
To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?
accession_num=20260114-3042__;!!KNMwiTCp4spf!DCD7P8bI5DE9iKb5BtB7J4qoBFmhsJc-rHyKsm4TNlSPu10lUWTdXnV1sd-
JMmpG4RiAIi0IbF6elmqSHw2ZdmsFPbKcxsIbPzhU$
To modify your subscriptions, click here:
rHyKsm4TNlSPu10lUWTdXnV1sd-JMmpG4RiAIi0IbF6elmqSHw2ZdmsFPbKcxkd1Uz1q$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DCD7P8bI5DE9iKb5BtB7J4qoBFmhsJc-
rHyKsm4TNlSPu10lUWTdXnV1sd-JMmpG4RiAIi0IbF6elmqSHw2ZdmsFPbKcxrrg6HAB$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections –San Francisco Regional Office
January 14, 2026
In reply refer to:
Project Nos. 96, 137, 175, 233,
606, 619, 803, 1061, 1121,
1354, 1962, 1988, 2105,2106,
2130, 2310, 2661, 2687,
2735-CA
VIA FERC Service
Mr. Russell Cruzen, P.E., Director
Power Generation, Asset Excellence
Pacific Gas and Electric Company
300 Lakeside Dr.
Oakland, CA 94612-3534
Re:2026 Planned Outage Schedule
Dear Mr. Cruzen:
This is in response to a letter dated November 4, 2025 from Mr. Matthew Joseph
regarding the 2026 planned outage schedule for the projects listed in Table 1 of the
Enclosure. We have reviewed the schedule for the outages and have the following
comment:
Notify us in the event that the proposed outages vary by more than 30 days.
We appreciate your continued efforts in this aspect of our dam safety program. If
you have any questions, please contact the FERC engineers listed in Table 1 that are
assigned to the specific projects. The FERC engineers’ phone numbers are listed in
Table 2.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer
Enclosure
Document Accession #: 20260114-3042 Filed Date: 01/14/2026
Frank L Blackett Digitally signed by Frank L Blackett
Date: 2026.01.14 07:14:59 -08'00'
PG&E Projects Addressed in 2026 Planned Outage Schedule Enclosure
Page 1 of 1
Table 1.Projects Addressed in 2026 Planned Outage Schedule
Project No.Project Name FERC Engineer
96 Kerckhoff Samuel Lee
137 Mokelumne River Vincent Vigil
175 Balch Samuel Lee
233 Pit No. 3 Diversion Fenggang Ma
606 Kilarc Samuel Lee
619 Bucks Creek Eunhye Kim
803 De Sabla-Centerville Eunhye Kim
1061 Phoenix Vincent Vigil
1121 Battle Creek Samuel Lee
1354 Crane Valley Samuel Lee
1962 Rock Creek-Cresta Eunhye Kim
1988 Haas-Kings River Samuel Lee
2105 Upper North Fork Feather River Eunhye Kim
2106 McCloud-Pit Fenggang Ma
2130 Spring Gap-Stanislaus Vincent Vigil
2310 Drum-Spaulding Thao Bui / Mynul Chowdhury
2661 Hat Creek Nos. 1 and 2 Fenggang Ma
2687 Pit No. 1 Fenggang Ma
2735 Helms Powerhouse Samuel Lee
Table 2.FERC Project Engineer Phone Numbers
FERC Engineer Phone Number
Samuel Lee (415) 369-3393
Vincent Vigil (415) 369-3315
Fenggang Ma (415) 369-3319
Eunhye Kim (415) 369-3321
Thao Bui (415) 369-3312
Mynul Chowdhury (415) 369-3313
Document Accession #: 20260114-3042 Filed Date: 01/14/2026
Document Content(s)
P-96-000 S98513 Year 2026 Schedule Planned Outages.docx.pdf...............1
Document Accession #: 20260114-3042 Filed Date: 01/14/2026