HomeMy WebLinkAbout01.14.26 Board Correspondence - FW_ Compliance Directives issued in FERC P-803-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Nuzum, Danielle; Loeser, Kamie Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-803-000 Date:Wednesday, January 14, 2026 4:31:20 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, January 14, 2026 12:06 PM Subject: Compliance Directives issued in FERC P-803-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 1/14/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Compliance Directives General Correspondence Delegated Order Description: Letter in response to filing of the Revised Comprehensive Assessment Part 12D Inspection Plan and Independent Consultant Team Proposal for the Philbrook Dam, part of the DeSabla Centerville Hydroelectric Project under P-803. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260114- 3094__;!!KNMwiTCp4spf!Evw7fFXvvWU3FEvFNiDxWUNuBub1322QJVVP7rIwGQktEw_FAfXBEmrOzwaVTh-UlpgTjJrI6A-MwtoW_qK8olVPhnNZnHH-KLsd$ To modify your subscriptions, click here: UlpgTjJrI6A-MwtoW_qK8olVPhnNZnMCr9LOj$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Evw7fFXvvWU3FEvFNiDxWUNuBub1322QJVVP7rIwGQktEw_FAfXBEmrOzwaVTh- UlpgTjJrI6A-MwtoW_qK8olVPhnNZnJsTotJw$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections 888 First Street, NE Routing Code: PJ-13 Washington, DC 20426 (202) 502-6314 Office January 14, 2026 In reply refer to: P-803-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric (PG&E) Company 300 Lakeside Dr. Oakland, CA 94612-3534 Subject: Revised Part 12D Inspection Plan and Independent Consultant Team Proposal, 2026 Comprehensive Assessment, Philbrook Dam. Dear Mr. Cruzen: This is in response to your December 18, 2025, letter that submitted the revised Part 12D Inspection Plan (Inspection Plan) for the Comprehensive Assessment (CA) of Philbrook Dam, which is part of the DeSabla Centerville Hydroelectric Project, FERC No. 803. We have reviewed the information provided and the revised Inspection Plan adequately addresses the comments contained in our November 24, 2025 letter, except for comment No. 1.c as noted below. Comment No. 1.c requested documentation demonstrating how Dr. Kathleen Darby, proposed as PFMA/L2RA facilitator, fulfils the requirements of Section 17-4.3.3 of Chapter 17 of the Commission’s Engineering Guidelines for the Evaluation of Hydropower Projects (Guidelines). To address this comment, the revised Inspection Plan provides additional information on the experience qualifications of Dr. Darby and proposes Mr. Jay Griffin as PFMA/L2RA co-facilitator. We have the following comments on the information provided: 1. The revised Inspection Plan indicates that Dr. Darby has 7 years of consulting experience and 4 years of research experience in geotechnical earthquake engineering. It is our understanding that most of her research experience was used to pursue postgraduate degrees. It is our judgment that time spent pursuing Document Accession #: 20260114-3094 Filed Date: 01/14/2026 2 academic degrees does not contribute to the minimum experience requirements of a facilitator provided in Chapter 17 of the Guidelines. Therefore, Dr. Darby does not meet the minimum of 10 years of dam safety experience required for a facilitator per the Guidelines and is not approved as a PFMA/L2RA facilitator. 2. Mr. Jay Griffin’s resume indicates that he has the required risk facilitator training and fulfils the requirements of Section 17-4.3.3 and Section 18-5.3 of Chapters 17 and 18, respectively, of the Guidelines, and is thus accepted in the PFMA/L2RA facilitator role. It should be noted that FERC is not currently enforcing the project risk analysis experience requirements included in Section 18-5.3 of Chapter 18 of the Guidelines. Per 18 CFR § 12.34(a), you are required to obtain the approval of the Independent Consultant (IC) Team from the Director, Division of Dam Safety and Inspections, prior to the performance of this Comprehensive Assessment. This letter constitutes approval of the Inspection Plan and the IC Team by the Director, Dam Safety and Inspections. The approved IC Team consists of Dr. Christopher Hunt as IC, and Mr. Rick Poeppelman, Dr. Michael George, Mr. James Barbis, Dr. Christie Hale, and Ms. Stephanie Owen as IC Team members (each of them accepted in our previous letter), and Mr. Jay Griffin as PFMA/L2RA facilitator (accepted in comment No. 2 above). If there is any change to the composition of the IC Team accepted above, then a response to this letter is required to request approval of the IC Team by the Director, Dam Safety and Inspections. Otherwise, no response will be required to this letter; the Pre-Inspection Preparation Report (PIPR) will be the next submittal due for this Part 12D Inspection. File your submittal using the Commission’s eFiling system at https://www.ferc.gov/ferc-online/overview using one of the following options: • IC Team composition changes – Make the following menu selections during eFiling: Hydro: Dam Safety; Washington, DC; and Independent Consultant Approval Request. Changes to the accepted IC Team must be submitted within 30 days of the date of this letter. • PIPR – Make the following menu selections during eFiling: Hydro: Dam Safety; San Francisco Regional Office. The PIPR must be submitted at least 30 days in advance of the first IC Team activity as described in 18 CFR § 12.42, which makes it due no later than March 21, 2026. You may submit the PIPR earlier than that, if preferred. As stated in the revised Inspection Plan, the PIPR is scheduled to be filed by March 21, 2026. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). Document Accession #: 20260114-3094 Filed Date: 01/14/2026 3 Thank you for your continued cooperation and interest in dam safety. If you have any questions, please contact me at (202) 502-6740 or carlos.zambrano@ferc.gov. Sincerely, Carlos Zambrano, P.E. Senior Civil Engineer Division of Dam Safety and Inspections Document Accession #: 20260114-3094 Filed Date: 01/14/2026 CARLOS ZAMBRAN O NARVAEZ Digitally signed by CARLOS ZAMBRANO NARVAEZ Date: 2026.01.14 14:22:57 -05'00' Document Content(s) P-803 Philbrook Revised CA Plan Review.pdf................................1 Document Accession #: 20260114-3094 Filed Date: 01/14/2026