Loading...
HomeMy WebLinkAbout02.05.26 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Friday, February 6, 2026 8:04:20 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, February 5, 2026 10:46 AM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 2/5/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits responses to address FERC's 01/22/2026 comments on the Periodic Inspection Plan for the Third Part 12D Inspection re the Round Valley Dam of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260205- 5093__;!!KNMwiTCp4spf!BgF5e7vuo-dNsf_YIj1wcWYdfJbepP5mV54jiBrWy-nhmvhaTKaq1FQy00Jy- TCHmxID5rSizTcSsUuGSwuD_vEn82RsIvEfIRDA$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!BgF5e7vuo- dNsf_YIj1wcWYdfJbepP5mV54jiBrWy-nhmvhaTKaq1FQy00Jy- TCHmxID5rSizTcSsUuGSwuD_vEn82RsIr8bH9-V$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!BgF5e7vuo- dNsf_YIj1wcWYdfJbepP5mV54jiBrWy-nhmvhaTKaq1FQy00Jy- TCHmxID5rSizTcSsUuGSwuD_vEn82RsIjBiYyLM$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 February 5, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Round Valley Dam, NATDAM No. CA00346 Third Part 12D Inspection – Periodic Inspection Plan Responses to FERC Comments ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company's (PG&E) responses to address the Federal Energy Regulatory Commission’s (FERC) comments on the periodic inspection plan (dated December 11, 2025) for the third Part 12D safety inspection of Round Valley Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, FERC No. 803. PG&E received FERC’s comments in a letter dated January 22, 2026. PG&E's responses to FERC’s comments are enclosed with this letter (Enclosure 1). A revised periodic inspection plan that addresses FERC’s comments is included in (Enclosure 2). PG&E believes FERC’s comments have been satisfactorily addressed based on the information enclosed with this letter. Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Holly Taylor, senior license coordinator for PG&E, at (530) 789-7653. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. Responses to FERC Comments Regarding the Third Part 12D Inspection – Periodic Inspection Plan 2. Round Valley Dam Third FERC Part 12D Safety Inspection, Period Inspection, Inspection Plan, prepared by Geosyntec and dated February 2, 2026 Document Accession #: 20260205-5093 Filed Date: 02/05/2026 Document Content(s) PGE20260205_803_RoundValley_3rdP12Plan_CmntRspsn_Ltr.pdf .................1 Document Accession #: 20260205-5093 Filed Date: 02/05/2026