Loading...
HomeMy WebLinkAbout01.29.26 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:BOS; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Thursday, January 29, 2026 8:27:00 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, January 29, 2026 5:26 AM Subject: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 1/28/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits summaries and conclusions of efforts to address Action Items 3 and 4 from the 2025 Annual Dam Safety Inspection of the Philbrook Dam et al. of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20260128-5284__;!!KNMwiTCp4spf!FtKZW_uUA56KJjpZ- 5EmW8pttu0DypPxugtYaxlijPHurwYeWabw5ksWtW1_UxorIIhWylNmZMV44sxxxcmW_3BLCxS6wTTqGoub$ To modify your subscriptions, click here: 5EmW8pttu0DypPxugtYaxlijPHurwYeWabw5ksWtW1_UxorIIhWylNmZMV44sxxxcmW_3BLCxS6wUgtXEg4$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!FtKZW_uUA56KJjpZ- 5EmW8pttu0DypPxugtYaxlijPHurwYeWabw5ksWtW1_UxorIIhWylNmZMV44sxxxcmW_3BLCxS6we9mwI8i$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 January 28, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 Round Valley Dam, NATDAM No. CA00346 2025 Annual FERC Inspection – Summaries and Conclusions for Action Items 3 and 4 ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter reports on the completion of Pacific Gas and Electric Company's (PG&E) efforts to address Action Items 3 and 4 (I-3 and I-4) from the 2025 annual Federal Energy Regulatory Commission (FERC) dam safety inspection of PG&E’s DeSabla-Centerville Hydroelectric Project, FERC No. 803. I-3 is regarding Philbrook Main Dam and I-4 is regarding Round Valley Dam. FERC inspected the project facilities with PG&E staff on August 7, 2025. PG&E submitted its original plans and schedules for addressing the items to FERC in a letter dated September 4, 2025. Summaries and conclusions of PG&E’s efforts to address the action items are enclosed with this letter (Enclosure 1). PG&E believes I-3 and I-4 have been satisfactorily addressed based on the information enclosed with this letter and no further action is necessary. Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure CUI//CEII – DO NOT RELEASE 1. Summaries and Conclusions for Action Items 3 and 4 from the 2025 Annual FERC Dam Safety Inspection Document Accession #: 20260128-5284 Filed Date: 01/28/2026 Document Content(s) PGE20260128_803_Philbrook_RoundValley_DSICmnt_Close_Ltr.pdf...............1 Document Accession #: 20260128-5284 Filed Date: 01/28/2026