HomeMy WebLinkAbout03.23.26 Board Correspondence - FW_ Delegated Order issued in FERC P-77-000,et al.From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens,
Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Cannon, Jamie
Subject:Board Correspondence - FW: Delegated Order issued in FERC P-77-000,et al.
Date:Monday, March 23, 2026 10:34:50 AM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Monday, March 23, 2026 8:38 AM
Subject: Delegated Order issued in FERC P-77-000,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 3/23/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-77-000
P-96-000
P-137-000
P-175-000
P-233-000
P-606-000
P-619-000
P-803-000
P-1061-000
P-1121-000
P-1354-000
P-1962-000
P-1988-000
P-2105-000
P-2106-000
P-2107-000
P-2130-000
P-2310-000
P-2661-000
P-2687-000
P-2735-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Delegated Order
Description: Letter to Pacific Gas and Electric Company granting the 02/26/2026 request for an extension of time to submit review results and plans for its debris boom program management by
05/31/2026 for the Potter Valley Project et al. under P-77 et al.
To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260323-
3030__;!!KNMwiTCp4spf!Goud2ODOuJ_nK8IyLRYYcRPf5r3jCFs38kErcWaKFjIGmfvCCraFYl1RAxZWrQ48__UOP2hRxdS-XPvjfE3Jm6rRyLNJmNlpYFWy$
To modify your subscriptions, click here:
XPvjfE3Jm6rRyLNJmKbmjSdU$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Goud2ODOuJ_nK8IyLRYYcRPf5r3jCFs38kErcWaKFjIGmfvCCraFYl1RAxZWrQ48__UOP2hRxdS-
XPvjfE3Jm6rRyLNJmE5edxLY$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections –San Francisco Regional Office
March 23, 2026
In reply refer to:
Project Nos. 77, 96, 137, 175,
233, 606, 619, 803, 1061,
1121, 1354, 1962, 1988, 2105,
2106, 2107, 2130, 2310, 2661,
2687, and 2735-CA
VIA FERC Service
Mr. Russell Cruzen, P.E., Director
Power Generation, Asset Excellence
Pacific Gas and Electric Company
300 Lakeside Dr.
Oakland, CA 94612-3534
Re:Debris Boom Program Management
Dear Mr. Cruzen:
This is in response to a letter dated February 26,2026 from Mr. Amir Zadeh that
submitted a request for an extension of time to submit review results and plans for
PG&E’s debris boom program management for the projects listed in Enclosure 1.We
have reviewed your proposed extension of time and grant your request to submit review
results and plans for the debris boom program management by May 31, 2026.
File your submittal using our eFiling system at https://www.ferc.gov/ferc-
online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional
Office from the eFiling menu. The cover page of the filings must indicate that the
material was eFiled. For assistance with eFiling, contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY).
We appreciate your cooperation in this aspect of our dam safety program. If you
have questions,contact our engineers listed in Enclosure 1 that are assigned to the
specific projects.Our engineers’ phone numbers are listed in Enclosure 2.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer
Enclosures (2)
1.Projects and FERC Project Engineers
2.FERC Project Engineers’Phone Numbers
Document Accession #: 20260323-3030 Filed Date: 03/23/2026
Frank L Blackett Digitally signed by Frank L Blackett
Date: 2026.03.23 07:15:38 -07'00'
Projects Included in Enclosure 1
PG&E’s Debris Boom Program Management
Page 1 of 1
Table 1. Projects and Project Engineers Covered by the
Debris Boom Program Manage ment
Project No.Project Name Engineer
77 Potter Valley Ryan Tom
96 Kerckhoff Samuel Lee
137 Mokelumne River Vincent Vigil
175 Balch Samuel Lee
233 Pit No. 3, 4, and 5 Fenggang Ma
606 Kilarc-Cow Creek Samuel Lee
619 Bucks Creek Eunhye Kim
803 De Sabla-Centerville Eunhye Kim
1061 Phoenix Vincent Vigil
1121 Battle Creek Samuel Lee
1354 Crane Valley Samuel Lee
1962 Rock Creek-Cresta Eunhye Kim
1988 Haas-Kings River Samuel Lee
2105
Upper North Fork Feather
River
Eunhye Kim
2106 McCloud-Pit Fenggang Ma
2107 Poe Eunhye Kim
2130 Spring Gap-Stanislaus Vincent Vigil
2310
Drum-Spaulding Mynul Chowdhury,
Thao Bui
2661 Hat Creek Nos. 1 and 2 Fenggang Ma
2687 Pit No. 1 Fenggang Ma
2735 Helms Samuel Lee
Document Accession #: 20260323-3030 Filed Date: 03/23/2026
FERC Project Engineers’ Phone Numbers for Enclosure 2
The Projects listed in Table 1
Page 1 of 1
Table 2. FERC Project Engineer Phone Numbers
FERC Engineer Phone Number
Eunhye Kim (415) 369-3321
Ryan Tom (415) 369-3347
Vincent Vigil (415) 369-3315
Fenggang Ma (415) 369-3319
Samuel Lee (415) 369-3393
Mynul Chowdhury (415) 369-3313
Thao Bui (415) 369-3312
Document Accession #: 20260323-3030 Filed Date: 03/23/2026
Document Content(s)
P-619-000 et al_109435_Debrisboom_PGE_Wide.docx.pdf ......................1
Document Accession #: 20260323-3030 Filed Date: 03/23/2026