Loading...
HomeMy WebLinkAbout03.23.26 Board Correspondence - FW_ Delegated Order issued in FERC P-77-000,et al.From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Delegated Order issued in FERC P-77-000,et al. Date:Monday, March 23, 2026 10:34:50 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, March 23, 2026 8:38 AM Subject: Delegated Order issued in FERC P-77-000,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 3/23/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-77-000 P-96-000 P-137-000 P-175-000 P-233-000 P-606-000 P-619-000 P-803-000 P-1061-000 P-1121-000 P-1354-000 P-1962-000 P-1988-000 P-2105-000 P-2106-000 P-2107-000 P-2130-000 P-2310-000 P-2661-000 P-2687-000 P-2735-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Delegated Order Description: Letter to Pacific Gas and Electric Company granting the 02/26/2026 request for an extension of time to submit review results and plans for its debris boom program management by 05/31/2026 for the Potter Valley Project et al. under P-77 et al. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260323- 3030__;!!KNMwiTCp4spf!Goud2ODOuJ_nK8IyLRYYcRPf5r3jCFs38kErcWaKFjIGmfvCCraFYl1RAxZWrQ48__UOP2hRxdS-XPvjfE3Jm6rRyLNJmNlpYFWy$ To modify your subscriptions, click here: XPvjfE3Jm6rRyLNJmKbmjSdU$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Goud2ODOuJ_nK8IyLRYYcRPf5r3jCFs38kErcWaKFjIGmfvCCraFYl1RAxZWrQ48__UOP2hRxdS- XPvjfE3Jm6rRyLNJmE5edxLY$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office March 23, 2026 In reply refer to: Project Nos. 77, 96, 137, 175, 233, 606, 619, 803, 1061, 1121, 1354, 1962, 1988, 2105, 2106, 2107, 2130, 2310, 2661, 2687, and 2735-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Debris Boom Program Management Dear Mr. Cruzen: This is in response to a letter dated February 26,2026 from Mr. Amir Zadeh that submitted a request for an extension of time to submit review results and plans for PG&E’s debris boom program management for the projects listed in Enclosure 1.We have reviewed your proposed extension of time and grant your request to submit review results and plans for the debris boom program management by May 31, 2026. File your submittal using our eFiling system at https://www.ferc.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filings must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your cooperation in this aspect of our dam safety program. If you have questions,contact our engineers listed in Enclosure 1 that are assigned to the specific projects.Our engineers’ phone numbers are listed in Enclosure 2. Sincerely, Frank L. Blackett, P.E. Regional Engineer Enclosures (2) 1.Projects and FERC Project Engineers 2.FERC Project Engineers’Phone Numbers Document Accession #: 20260323-3030 Filed Date: 03/23/2026 Frank L Blackett Digitally signed by Frank L Blackett Date: 2026.03.23 07:15:38 -07'00' Projects Included in Enclosure 1 PG&E’s Debris Boom Program Management Page 1 of 1 Table 1. Projects and Project Engineers Covered by the Debris Boom Program Manage ment Project No.Project Name Engineer 77 Potter Valley Ryan Tom 96 Kerckhoff Samuel Lee 137 Mokelumne River Vincent Vigil 175 Balch Samuel Lee 233 Pit No. 3, 4, and 5 Fenggang Ma 606 Kilarc-Cow Creek Samuel Lee 619 Bucks Creek Eunhye Kim 803 De Sabla-Centerville Eunhye Kim 1061 Phoenix Vincent Vigil 1121 Battle Creek Samuel Lee 1354 Crane Valley Samuel Lee 1962 Rock Creek-Cresta Eunhye Kim 1988 Haas-Kings River Samuel Lee 2105 Upper North Fork Feather River Eunhye Kim 2106 McCloud-Pit Fenggang Ma 2107 Poe Eunhye Kim 2130 Spring Gap-Stanislaus Vincent Vigil 2310 Drum-Spaulding Mynul Chowdhury, Thao Bui 2661 Hat Creek Nos. 1 and 2 Fenggang Ma 2687 Pit No. 1 Fenggang Ma 2735 Helms Samuel Lee Document Accession #: 20260323-3030 Filed Date: 03/23/2026 FERC Project Engineers’ Phone Numbers for Enclosure 2 The Projects listed in Table 1 Page 1 of 1 Table 2. FERC Project Engineer Phone Numbers FERC Engineer Phone Number Eunhye Kim (415) 369-3321 Ryan Tom (415) 369-3347 Vincent Vigil (415) 369-3315 Fenggang Ma (415) 369-3319 Samuel Lee (415) 369-3393 Mynul Chowdhury (415) 369-3313 Thao Bui (415) 369-3312 Document Accession #: 20260323-3030 Filed Date: 03/23/2026 Document Content(s) P-619-000 et al_109435_Debrisboom_PGE_Wide.docx.pdf ......................1 Document Accession #: 20260323-3030 Filed Date: 03/23/2026