HomeMy WebLinkAbout03.16.26 Board Correspondence - FW_ Delegated Order issued in FERC P-619-000From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod;
Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.;
Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Cannon, Jamie
Subject:Board Correspondence - FW: Delegated Order issued in FERC P-619-000
Date:Monday, March 16, 2026 8:39:33 AM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Monday, March 16, 2026 8:26 AM
Subject: Delegated Order issued in FERC P-619-000
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
On 3/16/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Delegated Order
Description: Letter to Pacific Gas and Electric Company accepting the 02/27/2026 plan and schedule to address
follow-up Action Item 2 by 10/31/2029 etc. for the Grizzly Forebay Dam, part of the Bucks Creek Project under P-
619.
To view the document for this Issuance, click here
https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260316-
3017__;!!KNMwiTCp4spf!DGdeBIJl78CSnf-
4to64gnGeWLDJb_9d2Ifk5gBkTjUnBpg2Uz24nqiAEnz7BlY_cboIlnRyemqSKEAMznsd0ooaw__sPIhHD0fk$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!DGdeBIJl78CSnf-
4to64gnGeWLDJb_9d2Ifk5gBkTjUnBpg2Uz24nqiAEnz7BlY_cboIlnRyemqSKEAMznsd0ooaw__sPC_VI6SX$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DGdeBIJl78CSnf-
4to64gnGeWLDJb_9d2Ifk5gBkTjUnBpg2Uz24nqiAEnz7BlY_cboIlnRyemqSKEAMznsd0ooaw__sPOIP0htw$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections –San Francisco Regional Office
March 16, 2026
In reply refer to:
Project No.619-CA
VIA FERC Service
Mr. Russell Cruzen, P.E., Director
Power Generation, Asset Excellence
Pacific Gas and Electric Company
300 Lakeside Dr.
Oakland, CA 94612-3534
Re:Action Item 2 from the 2025 follow-up Part 12D Field Inspections
Dear Mr.Cruzen:
This is in response to a letter dated February 27, 2026 from Mr. Robert Ellis that
submitted a plan and schedule to address follow-up Action Item 2 regarding evaluation of
the low-level outlet condition,which resulted from the 2025 follow-up Part 12D field
inspection for Grizzly Forebay Dam, part of the Bucks Creek Project, FERC No.619.
We have reviewed your submittal, and the plan and schedule to address Action Item 2 by
October 31, 2029 is acceptable.
File your submittal using our eFiling system at https://www.ferc.gov/ferc-
online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional
Office from the eFiling menu. The cover page of the filing must indicate that the
material was eFiled. For assistance with eFiling, contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY).
We appreciate your cooperation in this aspect of our dam safety program. If you
have any questions, contact Ms. Eunhye Kim at (415)369-3321.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer
Document Accession #: 20260316-3017 Filed Date: 03/16/2026
Frank L Blackett Digitally signed by Frank L
Blackett
Date: 2026.03.16 07:33:54 -07'00'