Loading...
HomeMy WebLinkAbout03.16.26 Board Correspondence - FW_ Delegated Order issued in FERC P-619-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Delegated Order issued in FERC P-619-000 Date:Monday, March 16, 2026 8:39:33 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, March 16, 2026 8:26 AM Subject: Delegated Order issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 3/16/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Delegated Order Description: Letter to Pacific Gas and Electric Company accepting the 02/27/2026 plan and schedule to address follow-up Action Item 2 by 10/31/2029 etc. for the Grizzly Forebay Dam, part of the Bucks Creek Project under P- 619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260316- 3017__;!!KNMwiTCp4spf!DGdeBIJl78CSnf- 4to64gnGeWLDJb_9d2Ifk5gBkTjUnBpg2Uz24nqiAEnz7BlY_cboIlnRyemqSKEAMznsd0ooaw__sPIhHD0fk$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!DGdeBIJl78CSnf- 4to64gnGeWLDJb_9d2Ifk5gBkTjUnBpg2Uz24nqiAEnz7BlY_cboIlnRyemqSKEAMznsd0ooaw__sPC_VI6SX$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DGdeBIJl78CSnf- 4to64gnGeWLDJb_9d2Ifk5gBkTjUnBpg2Uz24nqiAEnz7BlY_cboIlnRyemqSKEAMznsd0ooaw__sPOIP0htw$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office March 16, 2026 In reply refer to: Project No.619-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Action Item 2 from the 2025 follow-up Part 12D Field Inspections Dear Mr.Cruzen: This is in response to a letter dated February 27, 2026 from Mr. Robert Ellis that submitted a plan and schedule to address follow-up Action Item 2 regarding evaluation of the low-level outlet condition,which resulted from the 2025 follow-up Part 12D field inspection for Grizzly Forebay Dam, part of the Bucks Creek Project, FERC No.619. We have reviewed your submittal, and the plan and schedule to address Action Item 2 by October 31, 2029 is acceptable. File your submittal using our eFiling system at https://www.ferc.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your cooperation in this aspect of our dam safety program. If you have any questions, contact Ms. Eunhye Kim at (415)369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20260316-3017 Filed Date: 03/16/2026 Frank L Blackett Digitally signed by Frank L Blackett Date: 2026.03.16 07:33:54 -07'00' Document Content(s) P-619-000_95278_Grizzly_i2_2025-2ndPIL-ps.docx.pdf........................1 Document Accession #: 20260316-3017 Filed Date: 03/16/2026