Loading...
HomeMy WebLinkAbout03.13.26 Board Correspondence - FW_ Compliance Directives issued in FERC P-619-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-619-000 Date:Friday, March 13, 2026 10:21:48 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, March 13, 2026 9:36 AM Subject: Compliance Directives issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 3/13/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Compliance Directives Delegated Order Description: Letter to Pacific Gas and Electric Company accepting the 10/31/2025 Twelfth Part 12D Report for a Comprehensive Assessment for the Grizzly Forebay Dam, part of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260313- 3042__;!!KNMwiTCp4spf!CFxGL4m4utmavj9kbLb2Bcy_LBWtqU2KYnqhKHAniLX6g4LyuxCQIKXfUNui935WbowhMtv1Th3s9HVYAfnkgsz-AzC6UqG8vfCe$ To modify your subscriptions, click here: AzC6UigroTVl$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!CFxGL4m4utmavj9kbLb2Bcy_LBWtqU2KYnqhKHAniLX6g4LyuxCQIKXfUNui935WbowhMtv1Th3s9HVYAfnkgsz- AzC6UhEQceLi$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office March 13, 2026 In reply refer to: Project No. 619 –CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Initial Review of the Twelfth Part 12D Inspection Report –Grizzly Forebay Dam Dear Mr.Cruzen: This is in response to your letter dated October 31, 2025,from Mr. Robert Ellis who submitted the Twelfth Part 12D Report for a Comprehensive Assessment of Grizzly Forebay Dam, which is part of Bucks Creek Hydroelectric Project, FERC No. 619. On December 11, 2025,a Comprehensive Assessment Report (CAR) review meeting was held to discuss our initial review of the CAR. Based on our initial review, we find that the CAR is generally acceptable. However, we have the following comment: You must eFile the following document in order for us to complete our review of the CAR: o RTI International (RTI). 2024. Grizzly Forebay Probabilistic Flood Hazards Analysis. October 2024. Within 45 days from the date of this letter, address the comment above or provide a plan and schedule to address the comment. File your submittal using our eFiling system at https://www.ferc.gov/ferc-online/overview.When eFiling, select Hydro: Dam Safety and San Francisco Regional Office from the eFiling menu.The cover page of the filing must indicate that the material was eFiled.For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). Document Accession #: 20260313-3042 Filed Date: 03/13/2026 2 We appreciate your continued efforts in this aspect of our dam safety program.If you have any questions, contact Ms. Eunhye Kim at (415)369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20260313-3042 Filed Date: 03/13/2026 Frank L Blackett Digitally signed by Frank L Blackett Date: 2026.03.13 08:29:09 -07'00' Document Content(s) P-619-000_106992_Grizzly Forebay CAR Initial Review.docx.pdf..............1 Document Accession #: 20260313-3042 Filed Date: 03/13/2026