HomeMy WebLinkAbout06.26.2024 Board Correspondence - FW_ Jervois to begin work funded by U.S. Department of Defense to advance U.S. cobalt supply chain securityFrom:Clerk of the Board
To:Jessee, Meegan
Cc:Lee, Lewis
Subject:Board Correspondence - FW: Jervois to begin work funded by U.S. Department of Defense to advance U.S. cobalt
supply chain security
Date:Thursday, June 27, 2024 11:08:56 AM
Attachments:02676760.pdf
Please see Board Correspondence -
From: lance dreiss <lancedreiss@att.net>
Sent: Wednesday, June 26, 2024 10:32 AM
To: Senator.Dahle@senate.ca.gov; Assemblymember.Gallagher@assembly.ca.gov; District Attorney
<District_Attorney@buttecounty.net>; davidhollister@countyofplumas.com;
pcbs@countyofplumas.com; Durfee, Peter <PDurfee@buttecounty.net>; sheriff@pcso.net;
Kimmelshue, Tod <TKimmelshue@buttecounty.net>; Pickett, Andy <APickett@buttecounty.net>;
Angela Casler <acasler@sustainabilitymc.com>; Connelly, Bill <BConnelly@buttecounty.net>; Ring,
Brian <bring@buttecounty.net>; JULIE THREET <preyinghawkreport@gmail.com>; Waugh, Melanie
<mwaugh@buttecounty.net>; Ritter, Tami <TRitter@buttecounty.net>; Teeter, Doug
<DTeeter@buttecounty.net>; Clerk of the Board <clerkoftheboard@buttecounty.net>; Congressman
Doug LaMalfa <CA01DL.Outreach@mail.house.gov>; Stephens, Brad J.
<BStephens@buttecounty.net>
Subject: Jervois to begin work funded by U.S. Department of Defense to advance U.S. cobalt supply
chain security
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before
opening attachments, clicking on links, or replying..
Public Record
Never make the mistake of thinking the public is stupid.
https://urldefense.com/v3/__https://wcsecure.weblink.com.au/pdf/JRV/02676760.pdf__;!!KNMwiT
Cp4spf!B75FCYqffDUVMOvfrwmybI2slHqN8mM3Ulp7Ed5KxfoESOZiTjW_5afDJ7fHryXLMS4ifizZaVeFv
6UAhHdNUWaZP14rsA$
diana dreiss
1
A.B.N. 52 007 626 575
Suite 2.03, 1-11 Gordon Street, Cremorne, Victoria, 3121, Australia
16 June 2023 (Australia) ASX / TSX-V: JRV
OTC: JRVMF
• Jervois entered an agreement for US$15 million in funding from the United States
(“U.S.”) Government for drilling at its Idaho Cobalt Operations mine (“ICO”) and to do a
bankable feasibility study for construction of a cobalt refinery in the U.S.
• ICO’s mineral resource and reserve is the largest and highest grade confirmed cobalt
orebody in the U.S.
• Cobalt is a critical mineral as declared by the U.S. Government due to cobalt’s defense,
military and energy transition applications
Jervois Global Limited (“” or the “”) (ASX: JRV) (TSX-V: JRV) (OTC: JRVMF)
announces its subsidiary, Jervois Mining USA, has entered into an agreement with the United
States (“”) Department of Defense (“”), allowing Jervois to begin the work funded by
the previously announced DoD US$15 million funding (the ) to advance
U.S. cobalt supply chain security. The Agreement Funding is under the Manufacturing
Capability Expansion and Investment Prioritization (“”) office of Industrial Base Policy
(“”) using the U.S. Defense Production Act (“”) authorities and utilises funds from the
Additional Ukraine Supplemental Appropriations Act.
Jervois’ mineral resource drilling program at its 100% owned Idaho Cobalt Operations mine
(“”)will be accelerated by the Agreement Funding. The drilling program will define and
expand ICO’s RAM deposit existing cobalt resources and, also potentially, delineate the
adjacent Sunrise historic resource to modern geological standards.
The Agreement Funding will also fund a bankable feasibility study (a “”) for a cobalt refinery
in the U.S. to be completed by a Jervois subsidiary delegated by Jervois Mining USA.
Preparation of Jervois’ U.S. refinery BFS will be expedited by benefitting from efficiencies
provided by the Company’s decision to pivot to the US refinery BFS its efforts and work-in-
progress on a cobalt refinery expansion BFS at Jervois Finland, as announced on 18 April 2023.
Jervois Finland is Jervois’ 100% owned cobalt refining and advanced manufacturing operation
in Kokkola, Finland; existing cobalt refinery design and work product including flowsheet will be
utilized in preparing the U.S. refinery BFS.
Jervois suspended final construction at ICO in late March 2023 due to continuing low cobalt
prices and U.S. inflationary impacts on construction costs, to prudently preserve the value of
2
A.B.N. 52 007 626 575
Suite 2.03, 1-11 Gordon Street, Cremorne, Victoria, 3121, Australia
ICO's cobalt ore body. The Company expects cobalt prices to recover over the medium term,
driven by the energy transition (such as the growth of electric vehicle adoption etc.) and a
growing demand trend for cobalt with Western ESG credentials, such as cobalt from ICO.
ICO’s mineral resource and reserve is the largest and highest grade confirmed cobalt orebody
in the U.S. and, when commissioned, ICO will be the U.S.’ only primary cobalt mine. Cobalt is a
critical mineral as declared by the U.S. Government due to cobalt’s defense, military and
energy transition applications.
The DoD press release, including a statement from the U.S. Assistant Secretary of Defense for
Industrial Base Policy, Dr. Laura Taylor-Kale, is located on the DoD website.
On behalf of Jervois
Bryce Crocker, CEO
For further information, please contact:
Global
ames.may@jervoisglobal.com
Nathan Ryan
NWR Communications
nathan.ryan@nwrcommunications.com.au
Mob: +61 420 582 887
This news release may contain certain “Forward-Looking Statements” within the meaning of the United States
Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When used in this news
release, the words “anticipate”, “believe”, “estimate”, “expect”, “target, “plan”, “forecast”, “may”, “schedule”,
“expected” and other similar words or expressions identify forward-looking statements or information. These
forward-looking statements or information may relate to the timing of drilling activities at ICO, the timing of the
US refinery BFS, amount of funding provided to the Company from the U.S. DOD and certain other factors or
information. Such statements represent Jervois’ current views with respect to future events and are necessarily
based upon a number of assumptions and estimates that, while considered reasonable by Jervois, are inherently
subject to significant business, economic, competitive, political and social risks, contingencies and uncertainties.
Many factors, both known and unknown, could cause results, performance or achievements to be materially
different from the results, performance or achievements that are or may be expressed or implied by such
forward-looking statements. Jervois does not intend, and does not assume any obligation, to update these
forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any
other events affections such statements and information other than as required by applicable laws, rules and
regulations.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.