Loading...
HomeMy WebLinkAbout06.27.2024 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-2310-000,et al. by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:FW: Dam Safety Compliance Report submitted in FERC P-2310-000,et al. by Pacific Gas and Electric Company,et al. Date:Thursday, June 27, 2024 11:50:44 AM -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, June 27, 2024 6:05 AM Subject: Dam Safety Compliance Report submitted in FERC P-2310-000,et al. by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 6/27/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-2310-000 P-2130-000 P-137-008 P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits plan and schedule to conduct a spillway screening-level risk analysis for the Drum-Spaulding Hydroelectric Project, et al. under P-2310, et al. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240627- 5021__;!!KNMwiTCp4spf!FXu67eM6t_GR8Vnu8jsGd99vHHrX5fZ3M6JuLVagaGPE23EIR8IqSSNvnCVyMPqQhUH_gx1DNCgQ1tl0yxicN-cXCWnregs01c5r$ To modify your subscriptions, click here: cXCWnrevZ8hpEp$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!FXu67eM6t_GR8Vnu8jsGd99vHHrX5fZ3M6JuLVagaGPE23EIR8IqSSNvnCVyMPqQhUH_gx1DNCgQ1tl0yxicN- cXCWnrel8bOSh8$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 June 26, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Drum-Spaulding Hydroelectric Project, FERC No. 2310-CA Spring Gap-Stanislaus Hydroelectric Project, FERC No. 2130-CA Mokelumne River Hydroelectric Project, FERC No. 137-CA Bucks Creek Hydroelectric Project, FERC No. 619-CA Screening-Level Portfolio Risk Analysis for Multiple Dams – Plan and Schedule ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) plan and schedule to conduct a spillway screening-level risk analysis (SSLRA) to prioritize improvements at five of its spillways. PG&E plans to use the results of the SSLRA to support its long-term spillway capital improvement program. As part of the analysis, PG&E will conduct risk prioritization workshops to better understand the potential failure modes and life safety risks specific to the five spillways. For reference, the five spillways proposed for evaluation as part of the SSLRA are summarized in Table 1. Table 1. Spillways Proposed for Evaluation as Part of the Screening-Level Portfolio Risk Analysis Project Dam Drum-Spaulding Hydroelectric Project, FERC No. 2310-CA Lake Fordyce Dam, NATDAM No. CA00357 Halsey Forebay Dam, NATDAM No. CA00352 Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Diversion Dam, NATDAM No. CA00331 Spring Gap-Stanislaus Hydroelectric Project, FERC No. 2130-CA Relief Dam, NATDAM No. CA00390 Mokelumne River Hydroelectric Project, FERC No. 137-CA Upper Bear River Dam, NATDAM No. CA00379 PG&E retained Slate Geotechnical Consultants, Inc. to prepare a SSLRA plan, which is enclosed with this letter for the Federal Energy Regulatory Commission (FERC) review Document Accession #: 20240627-5021 Filed Date: 06/27/2024 Frank L. Blackett, P.E., Regional Engineer June 26, 2024 Page 2 (Enclosure 1). The plan describes PG&E’s proposed methodology and scope for the Level 1 risk assessment, identifies members of the risk assessment team, and provides resumes for the proposed SSLRA facilitators and subject matter experts. PG&E has reviewed the SSLRA plan and concurs with the information presented therein. As communicated in the SSLRA plan, PG&E has scheduled an in-person risk prioritization workshop for October 14 through 18, 2024, followed by a virtual workshop on October 28 through November 1, 2024. To maintain the planned schedule, PG&E respectfully requests FERC’s review and comments on the SSLRA plan by September 1, 2024. PG&E expects to complete the SSLRA in early 2025. By July 31, 2025, PG&E will submit the results of the SSLRA to FERC, along with plans and schedules for further actions to improve the spillways and implement interim risk-reduction measures, as appropriate. Should you have technical questions concerning this matter, please contact Mike Monaghan, senior consulting engineer for PG&E, at (510) 295-9544. For general questions, please contact Jackie Pope, license coordinator for PG&E, at (530) 254 -4007. Sincerely, David L. Ritzman, P.E., G.E. Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Spillway Risk Analysis Plan, prepared by Slate Engineering, and dated June 26, 2024 cc: via hard copy w/enclosure Sharon Tapia, Division Manager Department of Water Resources Division of Safety of Dams 2720 Gateway Oaks Drive, Suite 300 Sacramento, CA 95833 Document Accession #: 20240627-5021 Filed Date: 06/27/2024 Document Content(s) PGE20240626_multiple_proj_Spillway_Prioritization_Plan_Ltr.pdf............1 Document Accession #: 20240627-5021 Filed Date: 06/27/2024