Loading...
HomeMy WebLinkAbout07.02.2024 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al. Date:Tuesday, July 2, 2024 10:53:08 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, July 2, 2024 5:55 AM Subject: Project Operations Compliance Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 7/2/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-2107-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Description: Pacific Gas and Electric Company submits Summaries and Conclusions for FERC's 02/14/2024 Comment Nos. 1-4 re Installation of a Bypass Gate Bulkhead Project at the Poe Dam of the Poe Hydroelectric Project under P-2107. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240702- 5023__;!!KNMwiTCp4spf!BIEXNALJOpgKa7BsjnS0Qny5V_bcHfwZkvjd3UZa71znoqWo16Lsfy1j1CJzGKRcGpV-retrUzNDXE2rv2tERq1_w83gkTOBkX85$ To modify your subscriptions, click here: retrUzNDXE2rv2tERq1_w83gkZ8Ancti$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!BIEXNALJOpgKa7BsjnS0Qny5V_bcHfwZkvjd3UZa71znoqWo16Lsfy1j1CJzGKRcGpV- retrUzNDXE2rv2tERq1_w83gkeFmnIzc$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 July 1, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Poe Hydroelectric Project, FERC No. 2107-CA Poe Dam, NATDAM No. CA00328 Cofferdam Project – Summaries and Conclusions for FERC Comments ENCLOSURES CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter reports on the completion of Pacific Gas and Electric Company's (PG&E) efforts to address the Federal Energy Regulatory Commission’s (FERC) Comments 1 through 4 regarding the cofferdam project for Poe Dam, which is part of PG&E’s Poe Hydroelectric Project, FERC No. 2107. PG&E received FERC’s comments in a letter dated February 14, 2024, and provided a plan and schedule for addressing the comments on April 5, 2024. Summaries and conclusions of PG&E’s efforts to address FERC’s comments are enclosed with this letter (Enclosure 1). An updated technical memorandum prepared by PG&E’s consultant on the anchor design for the bypass gate bulkhead is provided in Enclosure 2. PG&E has reviewed the consultant’s technical memorandum and concurs with the information presented therein. PG&E believes Comments 1 through 4 have been satisfactorily addressed based on the information enclosed with this letter and no further action is necessary. Should you have technical questions concerning this matter, please contact Chris Tomes, dam safety engineer for PG&E, at (818) 584-9944. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. Summaries and Conclusions for FERC Comments Regarding Installation of a Bypass Gate Bulkhead 2. Poe Dam Bypass Bulkhead Reusable Anchor Design, Revision 2, prepared by Schnabel Engineering and dated April 22, 2024 Document Accession #: 20240702-5023 Filed Date: 07/02/2024 Document Content(s) PGE20240701_2107_Poe_Dam_RespToFERCCmnts_Ltr.pdf .........................1 Document Accession #: 20240702-5023 Filed Date: 07/02/2024