Loading...
HomeMy WebLinkAbout07.02.2024 Board Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Tuesday, July 2, 2024 10:54:44 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, July 2, 2024 6:25 AM Subject: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 7/2/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Request for Delay of Action/Extension of Time Description: Pacific Gas and Electric Company submits request for extension of time until 08/31/2024 to address Action Item 6 from Dam Safety Inspection for the Hendricks Head Dam part of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240702- 5036__;!!KNMwiTCp4spf!A1FoIbhkfsbz7onnz3mXFkiUzEwRTkixqsXfiI21JT- NS_vt4MPZNUiSp4xK390e7Y7vFRWVs7PfuZRkOEuo8lo3ka3bBTVcUB08$ To modify your subscriptions, click here: NS_vt4MPZNUiSp4xK390e7Y7vFRWVs7PfuZRkOEuo8lo3ka3bBWLtbB-x$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!A1FoIbhkfsbz7onnz3mXFkiUzEwRTkixqsXfiI21JT- NS_vt4MPZNUiSp4xK390e7Y7vFRWVs7PfuZRkOEuo8lo3ka3bBW3INmTT$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 July 1, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Hendricks Head Dam, NATDAM No. CA00702 2019 Annual FERC Inspection – Extension of Time Request for Action Item 6 ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) request for an extension of time to address Action Item 6 (I-6) from the annual Federal Energy Regulatory Commission (FERC) dam safety inspection for Hendricks Head Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, FERC No. 803. Included with PG&E’s extension of time request is a reasoned basis for the request, per Title 18 of the Code of Federal Regulations, Section 12.40(d). FERC inspected the project facilities with PG&E staff on July 8–9, 2019, and provided the follow-up action items to PG&E in a letter dated October 15, 2019. PG&E submitted its original plan and schedule for addressing I-6 in a letter to your office dated May 29, 2020, and provided its most recent status update on December 22, 2022. The extension of time request and reason for the request are enclosed with this letter (Enclosure 1). Should you have technical questions concerning this matter, please contact Kaitlyn Daniels, dam safety engineer for PG&E, at (707) 342-7885. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Extension of Time Request Document Accession #: 20240702-5036 Filed Date: 07/02/2024 Document Content(s) PGE20240701_803_SpillwayRepair_EOTR_Ltr.pdf...............................1 Document Accession #: 20240702-5036 Filed Date: 07/02/2024