Loading...
HomeMy WebLinkAbout07.05.2024 Board Correspondence - FW_ Compliance Directives issued in FERC P-619-000From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-619-000 Date:Wednesday, July 10, 2024 8:48:53 AM Please see Board correspondence - LeAnne Hancock Management Analyst I Butte County Administration T. 530.552.3314 -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, July 5, 2024 2:45 PM Subject: Compliance Directives issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 7/5/2024, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Compliance Directives Delegated Order Description: Letter authorizing Pacific Gas and Electric Company to proceed with construction of the Milk Ranch Conduit Diversion Management Project, part of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240705- 3044__;!!KNMwiTCp4spf!DghV-XW5X1HUD09w_w0Y4Tpuzpi41n6BIIU9oZNejvbTBkj86Y-0c- O8chGfnrpceJV4kTXi6LCxyBzR6Gb3vol7IpoXAR2c0r3P$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!DghV- XW5X1HUD09w_w0Y4Tpuzpi41n6BIIU9oZNejvbTBkj86Y-0c- O8chGfnrpceJV4kTXi6LCxyBzR6Gb3vol7IpoXAZruCHCF$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DghV- XW5X1HUD09w_w0Y4Tpuzpi41n6BIIU9oZNejvbTBkj86Y-0c- O8chGfnrpceJV4kTXi6LCxyBzR6Gb3vol7IpoXAWzrCq4P$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections – San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 July 5, 2024 In reply refer to: Project No. 619-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re: Milk Ranch Conduit Management Project Dear Mr. Cruzen: This is in response to a letter dated December 4, 2023 from Mr . Kyle Ingvoldsen that submitted the Milk Ranch Conduit Diversion Management Proj ect, which is part of the Bucks Creek Hydroelectric Project, FERC No. 619. We have r eviewed the submittal and have the following comment: x Provide an updated schedule for completion of the proposed work . Provided that you address the above comment within 10 days of t he date of this letter, you are authorized to proceed with construction upon re ceipt of this letter. Failure to adequately address our comment within 10 days will require a suspension of all work until the comments are addressed. You are responsible for ensuring completion of any necessary en vironmental coordination with resource agencies as well as the procurement of any federal, state, or local permits required for the work. Document Accession #: 20240705-3044 Filed Date: 07/05/2024 2 File your submittal using our efiling system at https://www.fer c.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety; San F rancisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202 ) 502-8659 (TTY). We appreciate your continued efforts in this aspect of our dam safety program. If you have questions, please contact Ms. Eunhye Kim at (415) 369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer cc: Ms. Sharon Tapia, Division Manager CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001 Frank L Blackett, P.E. Digitally signed by Frank L Blackett, P.E. Date: 2024.07.05 11:18:13 -07'00' Document Accession #: 20240705-3044 Filed Date: 07/05/2024 Document Content(s) P-619-000 S63043_Milk Ranch Conduit-Inactive.pdf .........................1 Document Accession #: 20240705-3044 Filed Date: 07/05/2024