Loading...
HomeMy WebLinkAbout07.05.2024 Board Correspondence - FW_ Compliance Directives issued in FERC P-803-000From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-803-000 Date:Wednesday, July 10, 2024 8:49:28 AM Please see Board correspondence - LeAnne Hancock Management Analyst I Butte County Administration T. 530.552.3314 -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, July 5, 2024 2:55 PM Subject: Compliance Directives issued in FERC P-803-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 7/5/2024, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Compliance Directives Delegated Order Description: Letter authorizing Pacific Gas and Electric Company to proceed with repairing the road to DeSabla Powerhouse, part of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240705- 3047__;!!KNMwiTCp4spf!GmqdlrVsID_dv31csG7V58Jz47MwjvuNY1COWG5p2xARpMOejLMSrAAxn4eBi23lHS2dGj9A2gF-nqU560eJTw4ZcGQdgNwMF-Q4$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!GmqdlrVsID_dv31csG7V58Jz47MwjvuNY1COWG5p2xARpMOejLMSrAAxn4eBi23lHS2dGj9A2gF- nqU560eJTw4ZcGQdgAK1h0RE$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GmqdlrVsID_dv31csG7V58Jz47MwjvuNY1COWG5p2xARpMOejLMSrAAxn4eBi23lHS2dGj9A2gF- nqU560eJTw4ZcGQdgMhEzH_G$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections – San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 July 5, 2024 In reply refer to: Project No. 803-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re: Authorization Request for Road Repair for DeSabla Powerhous e Dear Mr. Cruzen: This is in response to a letter dated April 11, 2024, from Mr. Kyle Ingvoldsen, that submitted an authorization request to repair the road to DeSabl a Powerhouse, which is part of DeSabla-Centerville Hydroelectric Project, FERC Project No. 803. We have reviewed the submittal, and we have the following comment: x Mr. Justin Welty is listed as having authority to stop work as shown in the Quality Control Inspection Program Organizational Chart. Howev er, Mr. Welty’s resume was not included with the submittal. Provide Mr. Justin Welty’s resume for our review. He must be authorized to have stop work authority before performing that function. Provided that you address the above comment within 10 days of t he date of this letter, you are immediately authorized to proceed with construc tion. Failure to adequately address our comments within 10 days will require a s uspension of all work until the comment is addressed. You are responsible for ensuring the completion of any necessary environmental coordination with resource agencies as well as the procurement of any federal, state, or local permits required for the work. Document Accession #: 20240705-3047 Filed Date: 07/05/2024 2 Within 90 days of completion or by January 30, 2025, submit a brief report documenting the road repair. File your submittal using our eFi ling system at https://www.ferc.gov/ferc-online/overview . When eFiling, select Hydro: Dam Safety and San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFi ling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll fre e), or (202) 502-8659 (TTY). We appreciate your continued efforts in this aspect of our dam safety program. If you have any questions, please contact Ms. Eunhye Kim at (415) 369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer cc: Ms. Sharon Tapia, Division Manager CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001 Frank L Blackett, P.E. Digitally signed by Frank L Blackett, P.E. Date: 2024.07.05 11:15:38 -07'00' Document Accession #: 20240705-3047 Filed Date: 07/05/2024 Document Content(s) P-803-000 S64700 S64701_DS PH Road Repair_Auth.pdf........................1 Document Accession #: 20240705-3047 Filed Date: 07/05/2024