HomeMy WebLinkAbout07.05.2024 Board Correspondence - FW_ General Correspondence issued in FERC P-803-000From:Clerk of the Board
To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan;
Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen;
Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie
Cc:Nevers, Dawn
Subject:Board Correspondence - FW: General Correspondence issued in FERC P-803-000
Date:Wednesday, July 10, 2024 8:49:10 AM
Please see Board correspondence -
LeAnne Hancock
Management Analyst I
Butte County Administration
T. 530.552.3314
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Friday, July 5, 2024 2:55 PM
Subject: General Correspondence issued in FERC P-803-000
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
On 7/5/2024, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: General Correspondence
Delegated Order
Description: Letter to Pacific Gas and Electric Company providing comments on the 03/14/2024 plan and schedule
to submit a long-term plan and next steps re the Butte Canal Service Return, part of the DeSabla-Centerville
Hydroelectric Project under P-803.
To view the document for this Issuance, click here
https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240705-
3046__;!!KNMwiTCp4spf!BaxMkKehM5J8ZD0-
FJCixyEFX0nTz4CVXGIJf7gbyNtkQmvCd5TOMWBLAfmmFambdMC6SHH3Q9JPXCvuYAIh-
_LyDWOLM8dNy_wD$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!BaxMkKehM5J8ZD0-
FJCixyEFX0nTz4CVXGIJf7gbyNtkQmvCd5TOMWBLAfmmFambdMC6SHH3Q9JPXCvuYAIh-
_LyDWOLM8EhMkpi$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!BaxMkKehM5J8ZD0-
FJCixyEFX0nTz4CVXGIJf7gbyNtkQmvCd5TOMWBLAfmmFambdMC6SHH3Q9JPXCvuYAIh-
_LyDWOLM_F4296F$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections – San Francisco Regional Office
100 First Street, Suite 2300
San Francisco, CA 94105-3084
(415) 369-3300
July 5, 2024
In reply refer to:
Project No. 803-CA
VIA FERC Service
Mr. Russell Cruzen, P.E., Director
Power Generation, Asset Excellence
Pacific Gas and Electric Company
300 Lakeside Dr.
Oakland, CA 94612-3534
Re: Plan and Schedule for Butte Canal Service Return
Dear Mr. Cruzen:
This is in response to a letter dated March 14, 2024, from Ms. Janet Walther, that
submitted a plan and schedule to submit a long-term plan and ne xt steps regarding the
Butte Canal Service Return, which is part of the DeSabla-Centerville Hydroelectric
Project, FERC No. 803. We have reviewed your submittal, and we have the following
comments that do not require a response:
1. An extended outage of the Butte Creek Canal is likely to have a dverse effects on
aquatic resources through elevated water temperatures in the DeSabla Forebay and
in the downstream reaches of Butte Creek, as evidenced by the r ecent March 26,
2024 letter from the California Department of Fish and Wildlife . Therefore, you
should make every effort to restore flows through the Butte Can al as soon as
possible or provide an alternate strategy for providing cool wa ter to Butte Creek
prior to the warmer months in 2024. We expect this objective will be
accomplished through the development of your annual Operations and
Maintenance Plan.
2. The plan and schedule for submitting the long-term plan and next steps by
December 1, 2024, is acceptable.
Document Accession #: 20240705-3046 Filed Date: 07/05/2024
2
File your submittal using our eFiling system at https://www.ferc.gov/ferc-
online/overview. When eFiling, select Hydro: Dam Safety; San F rancisco Regional
Office from the eFiling menu. The cover page of the filing must indicate that the
material was eFiled. For assistance with eFiling, contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202 ) 502-8659 (TTY).
We appreciate your continued efforts in this aspect of our dam sa fety program. If
you have any questions, please contact Ms. Eunhye Kim at (415) 369-3321.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer
cc:
Ms. Sharon Tapia, Division Manager
CA Dept. of Water Resources
Division of Safety of Dams
P.O. Box 942836
Sacramento, CA 94236-0001
Frank L Blackett, P.E.
Digitally signed by Frank L
Blackett, P.E.
Date: 2024.07.05 11:34:53 -07'00'
Document Accession #: 20240705-3046 Filed Date: 07/05/2024