HomeMy WebLinkAbout07.09.2024 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-2088-000 by Individual No Affiliation,et al.From:Clerk of the Board
To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts,
Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie
Cc:Nevers, Dawn
Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-2088-000 by Individual No Affiliation,et al.
Date:Wednesday, July 10, 2024 9:02:54 AM
Please see Board correspondence -
LeAnne Hancock
Management Analyst I
Butte County Administration
T. 530.552.3314
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Tuesday, July 9, 2024 10:21 AM
Subject: Dam Safety Compliance Report submitted in FERC P-2088-000 by Individual No Affiliation,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on
links, or replying..
On 7/9/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Individual No Affiliation
South Feather Water & Power Agency (as Agent)
Docket(s): P-2088-000
Lead Applicant: South Feather Water & Power Agency
Filing Type: Dam Safety Compliance Report
Description: South Feather Water and Power Agency submits status of items identified in the Report of Findings re the 2023 External
Audit of the Owner's Dam Safety Program re the South Feather Power Project under P-2088.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?
accession_num=20240709-5064__;!!KNMwiTCp4spf!FwWAJ_TX_GSZBrG4RU89121qI1Rn-
ILvL89gdt7g0VocaNwGeWb9bZQy03zHeW7ELoA2e5PS5QjSvWBDIuMTrLjd1bedVXITNntm$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!FwWAJ_TX_GSZBrG4RU89121qI1Rn-
ILvL89gdt7g0VocaNwGeWb9bZQy03zHeW7ELoA2e5PS5QjSvWBDIuMTrLjd1bedVYsp8L-q$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!FwWAJ_TX_GSZBrG4RU89121qI1Rn-
ILvL89gdt7g0VocaNwGeWb9bZQy03zHeW7ELoA2e5PS5QjSvWBDIuMTrLjd1bedVUBBa3UG$
or for phone support, call 866-208-3676.
July 9, 2024 Filed Electronically
Frank L. Blackett, P.E., Regional Engineer
100 First Street, Suite 2300
San Francisco, CA 94105
RE: South Feather Power Project (FERC No. 2088)
Status of items identified in the Report of Findings following the 2023 External Audit of the
South Feather Water and Power Agency’s Owner’s Dam Safety Program
Dear Mr. Blackett,
This letter serves as a follow-up to the Agency’s November 3, 2023 submittal of the Report of Findings
following the 2023 External Audit of the South Feather Water and Power Agency’s Owner’s Dam Safety
Program (Audit), and the Commission letter dated July 3, 2024 requesting a plan and schedule to
address the eighteen recommendations listed in the report. The Audit report was reviewed by myself
as the Chief Dam Safety Coordinator, as well as Power Division Management and staff, the General
Manager, and Board of Directors. We collectively concur with the contents of the Audit Report of
Findings, we agree that the recommendations taken from the Report of Findings should be addressed
by the Agency, and submit the attached documentation of compliance, and proposed plan and
schedule to do so.
If you have any questions related to this transmittal, please feel free to contact me at (530) 532-1348,
or via email at kmckillop@southfeather.com.
Sincerely,
South Feather Water and Power Agency
Kristen McKillop
Regulatory Compliance Manager, Chief Dam Safety Coordinator
Attachments: Status of compliance with ODSP Audit Recommendations (e-filed as CUI//CEII)
Updated ODSP (CUI//CEII e-filed separately)
cc: Rath Moseley, General Manager
Dan Leon, Power Division Manager
Silas Sanderson, PE, Chief Dam Safety Engineer
KRISTEN MCKILLOP
REGULATORY COMPLIANCE MANAGER
2310 ORO-QUINCY HIGHWAY
OROVILLE, CALIFORNIA 95966
KMCKILLOP@SOUTHFEATHER.COM
Document Accession #: 20240709-5064 Filed Date: 07/09/2024
Document Content(s)
to FERC_07092024_Transmit Plan and Sched ODSP Audit Findings.pd f..........1
Document Accession #: 20240709-5064 Filed Date: 07/09/2024