Loading...
HomeMy WebLinkAbout07.11.2024 Board Correspondence - FW_ Delegated Order issued in FERC P-619-000From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Delegated Order issued in FERC P-619-000 Date:Friday, July 12, 2024 8:03:41 AM Please see Board correspondence - LeAnne Hancock Management Analyst I Butte County Administration T. 530.552.3314 -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, July 12, 2024 5:15 AM Subject: Delegated Order issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 7/11/2024, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Delegated Order Description: Letter to Pacific Gas and Electric Company granting the 04/02/2024 request for an extension of time for the Grizzly Tap Removal and Reconnection Project at the Grizzly Forebay Dam, part of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240711- 3109__;!!KNMwiTCp4spf!A5XAuDTdTx-z4xG60ltRSt2F__ihLjVLHM- G7FTxY4Q1io_d6AIh82ZDmGJfIhJApe8c5nfHRqm74xFgXuRliAesJGicZkASleg-$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!A5XAuDTdTx- z4xG60ltRSt2F__ihLjVLHM- G7FTxY4Q1io_d6AIh82ZDmGJfIhJApe8c5nfHRqm74xFgXuRliAesJGicZsP5weYR$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!A5XAuDTdTx- z4xG60ltRSt2F__ihLjVLHM- G7FTxY4Q1io_d6AIh82ZDmGJfIhJApe8c5nfHRqm74xFgXuRliAesJGicZs1Csp9K$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections – San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 July 11, 2024 In reply refer to: Project No. 619-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re: Grizzly Tap Removal and Reconnection Project – Final Construction Report Dear Mr. Cruzen: This is in response to a letter dated April 2, 2024 from Mr. Ma tthew Joseph regarding an extension of time request for the Grizzly Tap Removal and Reconnection Project at Grizzly Forebay Dam, which is part of the Bucks Creek Hydroelectric Project, FERC No. 619. We have reviewed your proposed extension of time and grant your request to submit the final construction report by November 30, 2024. File your submittal using our eFiling system at https://www.ferc.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety; San F rancisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202 ) 502-8659 (TTY). Document Accession #: 20240711-3109 Filed Date: 07/11/2024 2 We appreciate your continued efforts in this aspect of our dam safety program. If you have any questions, please contact Ms. Eunhye Kim at (415) 369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer cc: Ms. Sharon Tapia, Division Manager CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001 Frank L Blackett, P.E. Digitally signed by Frank L Blackett, P.E. Date: 2024.07.11 14:28:38 -07'00' Document Accession #: 20240711-3109 Filed Date: 07/11/2024 Document Content(s) P-619-000 S64475_GrizzlyTap Removal Reconnect_EOT.pdf ....................1 Document Accession #: 20240711-3109 Filed Date: 07/11/2024