HomeMy WebLinkAbout07.16.2024 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Wednesday, July 17, 2024 10:49:21 AM Please see Board correspondence - LeAnne Hancock Management Analyst I Butte County Administration T. 530.552.3314 -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, July 16, 2024 5:55 AM Subject: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 7/16/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Description: Pacific Gas and Electric Company submits Notification of 2024 Outage Schedule Update for Bucks Powerhouse Unit 1 and Unit 2, part of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240716- 5020__;!!KNMwiTCp4spf!HaFE18hqA_YGxd17nZa9jmya12JHXugpAIoLsy2mXFyeZCQCV9WdC1TsAa_27jN-7SOte-0RQE9KEKlEQr08G40C4nu2bTSCLLrL$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!HaFE18hqA_YGxd17nZa9jmya12JHXugpAIoLsy2mXFyeZCQCV9WdC1TsAa_27jN- 7SOte-0RQE9KEKlEQr08G40C4nu2bTKpsFeB$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HaFE18hqA_YGxd17nZa9jmya12JHXugpAIoLsy2mXFyeZCQCV9WdC1TsAa_27jN-7SOte- 0RQE9KEKlEQr08G40C4nu2bTqFPU_8$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 July 15, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Powerhouse Update to 2024 Outage Schedule – Bucks Creek U1 and U2 Dear Frank L. Blackett: This letter presents an update to Pacific Gas and Electric Company's (PG&E) schedule of planned outages in 2024 which require dewatering of tunnels, conduits, or penstocks. Penstock dewatering is required for the Bucks Powerhouse Unit 1 (U1) and Unit 2 (U2), which is part of PG&E’s Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. PG&E submitted the 2024 outage schedule to FERC on October 26, 2023. Table 1: 2024 Current Outage Schedule and Updated Outage Schedule Current Outage Schedule 619 DeSabla Bucks Creek U1 Annual, Replace 11.5kv Aux Penstock 10/1/2024 1/10/2025 619 DeSabla Bucks Creek U2 Annual, Replace 11.5kv Aux ISO Meters, Capitol Outage Punchlist, 6scyr Gov Penstock 10/01/2024 01/10/2025 Updated Outage Schedule 619 DeSabla Bucks Creek U1 Annual, Replace CTs & ISO Meters, Rewind Warranty Rings Penstock 10/1/2024 10/31/2024 619 DeSabla Bucks Creek Annual, Replace CTs & ISO Meters, Capitol Outage Penstock 01/13/2025 01/31/2025 Document Accession #: 20240716-5020 Filed Date: 07/16/2024 Frank L. Blackett, P.E., Regional Engineer July 15, 2024 Page 2 The Bucks U1 and U2 outage schedule update reflects an expedited outage time due to the rescheduling of replacing the 11.5kv aux cubicles on both units. Replacement of the aux cubicles on U1 and U2 was previously scheduled for October 1, 2024, and has been rescheduled for 2025. This rescheduling reduces the outage time in U1 from 102 days to 31 days and in U2 from 102 days to 19 days. Additionally, replacement of U1’s bearing slinger rings has been added to the updated outage schedule. This routine maintenance outage will follow the previously executed procedures that have been coordinated with your office. If you have questions or comments regarding this matter, please contact Jamie Visinoni, senior license coordinator for PG&E, at (530) 215-6676. Sincerely, Matthew Joseph Supervisor, Hydro License Management Document Accession #: 20240716-5020 Filed Date: 07/16/2024 Document Content(s) PGE20240715_619_Bucks PH_Dewatering_Update.pdf ...........................1 Document Accession #: 20240716-5020 Filed Date: 07/16/2024