HomeMy WebLinkAbout07.16.2024 Board Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board
To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy;
Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie
Cc:Nevers, Dawn
Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
Date:Wednesday, July 17, 2024 10:49:36 AM
Please see Board correspondence -
LeAnne Hancock
Management Analyst I
Butte County Administration
T. 530.552.3314
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Tuesday, July 16, 2024 6:15 AM
Subject: Request for Delay of Action/Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 7/16/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Pacific Gas & Electric Company (as Agent)
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Request for Delay of Action/Extension of Time
Description: Pacific Gas and Electric Company submits request for extension of time until 7/31/2024 to address Recommendation No. 3 from the Eleventh Part
12D Safety Inspection Report re the Bucks Diversion Dam of the Bucks Creek Hydroelectric Project under P-619.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240716-
5025__;!!KNMwiTCp4spf!Hv0ZVLedzaOfejzumXubmdVfBcHba0phkRoqQNwEcDfEwA91X-3hP1gEsX6v-_7GVSiZXQtHgPDMBm0nvD-hy2OBAvytumN-
Ciev$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Hv0ZVLedzaOfejzumXubmdVfBcHba0phkRoqQNwEcDfEwA91X-
3hP1gEsX6v-_7GVSiZXQtHgPDMBm0nvD-hy2OBAvytul4D_KNZ$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Hv0ZVLedzaOfejzumXubmdVfBcHba0phkRoqQNwEcDfEwA91X-
3hP1gEsX6v-_7GVSiZXQtHgPDMBm0nvD-hy2OBAvytupvYvZJ0$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
July 15, 2024
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
Bucks Diversion Dam, NATDAM No. CA00331
11th Part 12D Inspection – Recommendation 3a
Extension of Time Request
ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents Pacific Gas and Electric Company’s (PG&E) request for extension of time
(EOT) to address Recommendation 3 (R-3) from the 11th 5-year Part 12D safety inspection
report (dated January 2021) for Bucks Diversion Dam, which is p art of PG&E’s Bucks Creek
Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. Included with
PG&E’s EOT request is a reasoned basis for the request, per Title 18 of the Code of Federal
Regulations, Section 12.40(d).
PG&E provided its most recent EOT regarding R-3a in a letter to FERC dated May 24, 2024,
that extended the assessment completion date to July 15, 2024. PG&E received FERC’s
acceptance of its May 24, 2024, EOT in a letter to PG&E dated July 11, 2024. This EOT
request and reason for the request is enclosed with this letter (Enclosure 1).
Should you have technical questions concerning this matter, please contact Ben Fontana,
senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please
contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure: CUI//CEII – DO NOT RELEASE
1. Extension of Time Request
Document Accession #: 20240716-5025 Filed Date: 07/16/2024
Document Content(s)
PGE20240715_619_Bucks_Diversion_Dam_R3_EOT_Ltr.pdf........................1