Loading...
HomeMy WebLinkAbout09.19.2024 Board Correspondence - FW_ DOCKET CHANGE- Cultural Resources Inventory - Report_Archaeological Study submitted in FERC P-619-184 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Pack, Joshua Cc:Nevers, Dawn Subject:Board Correspondence - FW: DOCKET CHANGE- Cultural Resources Inventory - Report/Archaeological Study submitted in FERC P- 619-184 by Pacific Gas and Electric Company Date:Friday, September 20, 2024 4:17:42 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, September 19, 2024 10:46 AM Subject: DOCKET CHANGE- Cultural Resources Inventory - Report/Archaeological Study submitted in FERC P-619-184 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 9/13/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-184 Lead Applicant: Pacific Gas and Electric Company Filing Type: Cultural Resources Inventory - Report/Archaeological Study Project Operations Compliance Report Description: Pacific Gas and Electric Company submits 2023 Annual Historic Properties Management Plan Implementation Report re the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20240913-5008__;!!KNMwiTCp4spf!DWjJhvd8V7YRYroZ1zaoR6fbZju- z3Dbfa_bI3izfyoyC58bUenvpcC_n7P_Ju_PsTdxTRdLoFPTDyPB45I6TSctESR1D-6eYSQP$ To modify your subscriptions, click here: z3Dbfa_bI3izfyoyC58bUenvpcC_n7P_Ju_PsTdxTRdLoFPTDyPB45I6TSctESR1D3yUZOcX$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DWjJhvd8V7YRYroZ1zaoR6fbZju- z3Dbfa_bI3izfyoyC58bUenvpcC_n7P_Ju_PsTdxTRdLoFPTDyPB45I6TSctESR1DwgzgQXC$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 September 12, 2024 Via Electronic Submittal (E-File) Debbie-Anne A. Reese, Acting Secretary Federal Energy Regulatory Commission 888 First Street, N. E. Washington, D.C. 20426 Re: Bucks Creek Hydroelectric Project, FERC No. 619-CA-CA Annual Historic Properties Management Plan Implementation Report Forest Service 4(e) Condition No. 58 ENCLOSURE CONTAINS PRIVILEGED INFORMATION (CUI//PRIV) – DO NOT RELEASE Dear Acting Secretary Reese: This letter is regarding Pacific Gas and Electric Company (PG&E) and the City of Santa Clara’s (Licensees) Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. FERC issued a new license for the Bucks Creek Project (Project) on June 16, 2022 (License). A Programmatic Agreement (PA) was executed for the Project on September 13, 2021. Article 404 of the License requires Licensees to implement the approved PA and Historic Properties Management Plan (HPMP). United States Forest Service (Forest Service) 4(e) Condition No. 58 (Condition No. 58) of the License requires the Licensee to implement the HPMP. The HPMP requires the Licensees to file the Annual HPMP Implementation Report (Enclosure 1). Per the PA, the Licensees will hold an Annual HPMP Meeting. The Annual HPMP Meeting was held on July 22, 2024; agenda and meeting notes are included in Attachment D of Enclosure 1. The PA requires the draft Annual HPMP Implementation Report to be shared with consulting parties 31 days prior to the meeting. The Draft Annual HPMP Report was provided to consulting parties on June 3, 2024. Written comments from consulting parties have been addressed in the Final HPMP Implementation Report, and a record of comments has been included in Attachment E of Enclosure 1. For general questions, please contact PG&E’s Senior Cultural Resource Specialist, Kathleen Forrest, at (916) 899-1365 or PG&E’s Senior License Coordinator, Jamie Visinoni, at (530) 215-6676. Sincerely, Megan Young Senior Hydro License Coordinator Enclosure: CUI//PRIV – DO NOT RELEASE 1. 2023 Annual Historic Properties Management Plan Implementation Report cc: See Attached List Document Accession #: 20240913-5008 Filed Date: 09/13/2024 Debbie-Anne A. Reese, Acting Secretary September 12, 2024 Page 2 cc: via email w/enclosure Julianne Polanco, State Historic Preservation Officer - calshpo.ohp@parks.ca.gov Brendon Greenaway, Office of Historic Preservation -Brendon.Greenaway@parks.ca.gov Chris O’Brien, Heritage Program Manager, Plumas National Forest - chris.obrien@usda.gov Ashlee Taylor, Mt. Hough Ranger District Archaeologist - Ashlee.Taylor@usda.gov; Fred Mankins - bigwolf_1962@yahoo.com Kyle Self, Chair, Greenville Rancheria - kself@greenvillerancheria.com; Patty Allen, Greenville Rancheria - pallen@greenvillerancheria.com Arian Hart, Tribal Chairman, Susanville Indian Rancheria - ahart@sir-nsn.gov; Brandie Cooper, Natural Resource Director, Susanville Indian Rancheria - bcooper@sir- nsn.gov Maxwell Sickler, Advisory Council on Historic Preservation - msickler@ahcp.gov Misty Salem, Maidu Summit Consortium - misty@maidusummit.org Document Accession #: 20240913-5008 Filed Date: 09/13/2024 Document Content(s) PGE20240912_619_Bucks_Creek_HPMP_Report_Ltr.pdf...........................1 Document Accession #: 20240913-5008 Filed Date: 09/13/2024