HomeMy WebLinkAbout09.19.2024 Board Correspondence - FW_ DOCKET CHANGE- Cultural Resources Inventory - Report_Archaeological Study submitted in FERC P-619-184 by Pacific Gas and Electric CompanyFrom:Clerk of the Board
To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod;
Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth;
Pack, Joshua
Cc:Nevers, Dawn
Subject:Board Correspondence - FW: DOCKET CHANGE- Cultural Resources Inventory - Report/Archaeological Study submitted in FERC P-
619-184 by Pacific Gas and Electric Company
Date:Friday, September 20, 2024 4:17:42 PM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Thursday, September 19, 2024 10:46 AM
Subject: DOCKET CHANGE- Cultural Resources Inventory - Report/Archaeological Study submitted in FERC P-619-184 by
Pacific Gas and Electric Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking
on links, or replying..
On 9/13/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-619-184
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Cultural Resources Inventory - Report/Archaeological Study
Project Operations Compliance Report
Description: Pacific Gas and Electric Company submits 2023 Annual Historic Properties Management Plan Implementation
Report re the Bucks Creek Hydroelectric Project under P-619.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?
accession_num=20240913-5008__;!!KNMwiTCp4spf!DWjJhvd8V7YRYroZ1zaoR6fbZju-
z3Dbfa_bI3izfyoyC58bUenvpcC_n7P_Ju_PsTdxTRdLoFPTDyPB45I6TSctESR1D-6eYSQP$
To modify your subscriptions, click here:
z3Dbfa_bI3izfyoyC58bUenvpcC_n7P_Ju_PsTdxTRdLoFPTDyPB45I6TSctESR1D3yUZOcX$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DWjJhvd8V7YRYroZ1zaoR6fbZju-
z3Dbfa_bI3izfyoyC58bUenvpcC_n7P_Ju_PsTdxTRdLoFPTDyPB45I6TSctESR1DwgzgQXC$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
September 12, 2024
Via Electronic Submittal (E-File)
Debbie-Anne A. Reese, Acting Secretary
Federal Energy Regulatory Commission
888 First Street, N. E.
Washington, D.C. 20426
Re: Bucks Creek Hydroelectric Project, FERC No. 619-CA-CA
Annual Historic Properties Management Plan Implementation Report
Forest Service 4(e) Condition No. 58
ENCLOSURE CONTAINS PRIVILEGED INFORMATION
(CUI//PRIV) – DO NOT RELEASE
Dear Acting Secretary Reese:
This letter is regarding Pacific Gas and Electric Company (PG&E) and the City of Santa Clara’s
(Licensees) Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No.
619. FERC issued a new license for the Bucks Creek Project (Project) on June 16, 2022 (License). A
Programmatic Agreement (PA) was executed for the Project on September 13, 2021. Article 404 of
the License requires Licensees to implement the approved PA and Historic Properties Management
Plan (HPMP). United States Forest Service (Forest Service) 4(e) Condition No. 58 (Condition No. 58)
of the License requires the Licensee to implement the HPMP.
The HPMP requires the Licensees to file the Annual HPMP Implementation Report (Enclosure 1). Per
the PA, the Licensees will hold an Annual HPMP Meeting. The Annual HPMP Meeting was held on
July 22, 2024; agenda and meeting notes are included in Attachment D of Enclosure 1. The PA
requires the draft Annual HPMP Implementation Report to be shared with consulting parties 31 days
prior to the meeting. The Draft Annual HPMP Report was provided to consulting parties on June 3,
2024. Written comments from consulting parties have been addressed in the Final HPMP
Implementation Report, and a record of comments has been included in Attachment E of Enclosure 1.
For general questions, please contact PG&E’s Senior Cultural Resource Specialist, Kathleen Forrest,
at (916) 899-1365 or PG&E’s Senior License Coordinator, Jamie Visinoni, at (530) 215-6676.
Sincerely,
Megan Young
Senior Hydro License Coordinator
Enclosure: CUI//PRIV – DO NOT RELEASE
1. 2023 Annual Historic Properties Management Plan Implementation Report
cc: See Attached List
Document Accession #: 20240913-5008 Filed Date: 09/13/2024
Debbie-Anne A. Reese, Acting Secretary
September 12, 2024
Page 2
cc: via email w/enclosure
Julianne Polanco, State Historic Preservation Officer - calshpo.ohp@parks.ca.gov
Brendon Greenaway, Office of Historic Preservation -Brendon.Greenaway@parks.ca.gov
Chris O’Brien, Heritage Program Manager, Plumas National Forest - chris.obrien@usda.gov
Ashlee Taylor, Mt. Hough Ranger District Archaeologist - Ashlee.Taylor@usda.gov;
Fred Mankins - bigwolf_1962@yahoo.com
Kyle Self, Chair, Greenville Rancheria - kself@greenvillerancheria.com;
Patty Allen, Greenville Rancheria - pallen@greenvillerancheria.com
Arian Hart, Tribal Chairman, Susanville Indian Rancheria - ahart@sir-nsn.gov;
Brandie Cooper, Natural Resource Director, Susanville Indian Rancheria - bcooper@sir-
nsn.gov
Maxwell Sickler, Advisory Council on Historic Preservation - msickler@ahcp.gov
Misty Salem, Maidu Summit Consortium - misty@maidusummit.org
Document Accession #: 20240913-5008 Filed Date: 09/13/2024
Document Content(s)
PGE20240912_619_Bucks_Creek_HPMP_Report_Ltr.pdf...........................1
Document Accession #: 20240913-5008 Filed Date: 09/13/2024