Loading...
HomeMy WebLinkAbout09.20.2024 Board Correspondence - FW_ Delegated Order issued in FERC P-2107-000From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Delegated Order issued in FERC P-2107-000 Date:Friday, September 20, 2024 4:35:59 PM Please see Board Correspondence - -----Original Message----- From: Clerk of the Board <clerkoftheboard@buttecounty.net> Sent: Friday, September 20, 2024 4:17 PM To: Bennett, Robin <RBennett@buttecounty.net>; Clerk of the Board <clerkoftheboard@buttecounty.net>; Connelly, Bill <BConnelly@buttecounty.net>; Cook, Holly <HCook@buttecounty.net>; Cook, Robin <RCook@buttecounty.net>; Durfee, Peter <PDurfee@buttecounty.net>; Jessee, Meegan <Mjessee@buttecounty.net>; Kimmelshue, Tod <TKimmelshue@buttecounty.net>; Kitts, Melissa <mkitts@buttecounty.net>; Lee, Lewis <lelee@buttecounty.net>; Pickett, Andy <APickett@buttecounty.net>; Ritter, Tami <TRitter@buttecounty.net>; Stephens, Brad J. <BStephens@buttecounty.net>; Sweeney, Kathleen <KASweeney@buttecounty.net>; Teeter, Doug <DTeeter@buttecounty.net>; Zepeda, Elizabeth <ezepeda@buttecounty.net>; Pack, Joshua <jpack@buttecounty.net> Cc: Nevers, Dawn <dnevers@buttecounty.net> Subject: FW: Delegated Order issued in FERC P-2107-000 -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, September 19, 2024 5:35 AM Subject: Delegated Order issued in FERC P-2107-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 9/18/2024, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-2107-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Delegated Order Description: Letter to Pacific Gas and Electric Company granting the 04/12/2024 request for an extension to replace the existing hoist components for the radial gate for the Poe Hydroelectric Project under P-2107. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20240918-3073__;!!KNMwiTCp4spf!Crl_lvInzRZpS3L8kicMllpdtC8l-Ibd0JajGoEu-6zYhVcRMBdPdyGE- LYF2S33-oA-NmcKKVXi2xBuQqdE5nhPkriTdvVXNSSv$ To modify your subscriptions, click here: Ibd0JajGoEu-6zYhVcRMBdPdyGE-LYF2S33-oA-NmcKKVXi2xBuQqdE5nhPkriTdiXwSzSb$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Crl_lvInzRZpS3L8kicMllpdtC8l- Ibd0JajGoEu-6zYhVcRMBdPdyGE-LYF2S33-oA-NmcKKVXi2xBuQqdE5nhPkriTdnZtK-TK$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections – San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 September 18, 2024 In reply refer to: Project No. 2107-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re: 2021 Radial Bypass Gate Hoist Evaluation Report Dear Mr. Cruzen: This is in response to a letter dated April 12, 2024 from Mr. Robert Ellis that submitted a request for an extension to replace the existing hoist components for the radial gate for the Poe Hydroelectric Project, FERC No. 2107. We have reviewed your proposed extension of time and grant your request to replace the existing hoist components by December 15, 2025. File your submittal using our eFiling system at https://www.ferc.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your continued efforts in this aspect of our dam safety program. If you have any questions, please contact Ms. Eunhye Kim at (415) 369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Frank L Blackett, P.E.Digitally signed by Frank L Blackett, P.E. Date: 2024.09.18 13:57:23 -07'00' Document Accession #: 20240918-3073 Filed Date: 09/18/2024 2 cc: Ms. Sharon Tapia, Division Manager CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001 Document Accession #: 20240918-3073 Filed Date: 09/18/2024 Document Content(s) P-2107-000 S64695_Poe Gate lift chains_EOT.pdf ...........................1 Document Accession #: 20240918-3073 Filed Date: 09/18/2024