Loading...
HomeMy WebLinkAbout09.30.2024 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Pack, Joshua Cc:Nevers, Dawn Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Monday, September 30, 2024 4:02:55 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, September 30, 2024 5:47 AM Subject: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 9/30/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits plan and schedule for analysis of alternatives re results of Fast Lagrangian Analysis of Continua computer program re the Round Valley Dam of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240930- 5027__;!!KNMwiTCp4spf!Dz_Gj_kBTBJUEgCxASRd92NHNfNj56lv5K0EQTy8ZSFKV89U2hscRuG2D56UUPjBxb4OOV57djBqnsen8w_nVAV6eJMrItIeiQ6c$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Dz_Gj_kBTBJUEgCxASRd92NHNfNj56lv5K0EQTy8ZSFKV89U2hscRuG2D56UUPjBxb4OOV57djBqnsen8w_nVAV6eJMrItYzMmut$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 September 27, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Round Valley Dam, NATDAM No. CA00346 Results of FLAC Analysis Plan and Schedule for Analysis of Alternatives ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents the results of a nonlinear deformation analysis performed for Round Valley Dam, which is part of Pacific Gas and Electric Company’s (PG&E) DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. This letter also presents PG&E’s plan and schedule to provide the results of an analysis of alternatives for long- term mitigation of the seismic instability of the dam. In a letter to FERC dated February 26, 2024, PG&E presented the plan to use the Fast Lagrangian Analysis of Continua (FLAC) computer program to perform additional analyses to better evaluate the expected deformation of the embankment under seismic loading. PG&E’s discussion of the results of the analysis and plan and schedule for further action are enclosed with this letter in (Enclosure 1). The FLAC analysis report is included with this letter as (Enclosure 2). PG&E has reviewed the consultant’s work products and concurs with the information presented therein. Should you have technical questions concerning this matter, please contact Kaitlyn Daniels, dam safety engineer for PG&E, at (707) 342-7885. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. Discussion of Results of FLAC Analysis and Plan and Schedule for Analysis of Alternatives 2. Round Valley Dam Nonlinear Deformation Analysis, prepared by Gannett Fleming and dated August 29, 2024 cc: See Attached List Document Accession #: 20240930-5027 Filed Date: 09/30/2024 Frank L. Blackett, P.E., Regional Engineer September 27, 2024 Page 2 cc: via hard copy w/enclosures Sharon Tapia, Division Manager Department of Water Resources Division of Safety of Dams 2720 Gateway Oaks Drive, Suite 300 Sacramento, CA 95833 via email w/enclosures Richard A. Keizer Jr., P.E., DSOD Design Engineer richard.keizer@water.ca.gov Document Accession #: 20240930-5027 Filed Date: 09/30/2024 Document Content(s) PGE20240927_803_R-19_FLACResults_Ltr.pdf..................................1 Document Accession #: 20240930-5027 Filed Date: 09/30/2024