HomeMy WebLinkAbout09.30.2024 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board
To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda,
Elizabeth; Pack, Joshua
Cc:Nevers, Dawn
Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.
Date:Monday, September 30, 2024 4:02:55 PM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Monday, September 30, 2024 5:47 AM
Subject: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 9/30/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Pacific Gas & Electric Company (as Agent)
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Dam Safety Compliance Report
Description: Pacific Gas and Electric Company submits plan and schedule for analysis of alternatives re results of Fast Lagrangian Analysis of Continua computer program re the Round Valley Dam of the DeSabla-Centerville
Hydroelectric Project under P-803.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240930-
5027__;!!KNMwiTCp4spf!Dz_Gj_kBTBJUEgCxASRd92NHNfNj56lv5K0EQTy8ZSFKV89U2hscRuG2D56UUPjBxb4OOV57djBqnsen8w_nVAV6eJMrItIeiQ6c$
To modify your subscriptions, click here:
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Dz_Gj_kBTBJUEgCxASRd92NHNfNj56lv5K0EQTy8ZSFKV89U2hscRuG2D56UUPjBxb4OOV57djBqnsen8w_nVAV6eJMrItYzMmut$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
September 27, 2024
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
Round Valley Dam, NATDAM No. CA00346
Results of FLAC Analysis
Plan and Schedule for Analysis of Alternatives
ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents the results of a nonlinear deformation analysis performed for Round Valley
Dam, which is part of Pacific Gas and Electric Company’s (PG&E) DeSabla-Centerville
Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. This letter also
presents PG&E’s plan and schedule to provide the results of an analysis of alternatives for long-
term mitigation of the seismic instability of the dam.
In a letter to FERC dated February 26, 2024, PG&E presented the plan to use the Fast
Lagrangian Analysis of Continua (FLAC) computer program to perform additional analyses to
better evaluate the expected deformation of the embankment under seismic loading. PG&E’s
discussion of the results of the analysis and plan and schedule for further action are enclosed
with this letter in (Enclosure 1). The FLAC analysis report is included with this letter as
(Enclosure 2). PG&E has reviewed the consultant’s work products and concurs with the
information presented therein.
Should you have technical questions concerning this matter, please contact Kaitlyn Daniels,
dam safety engineer for PG&E, at (707) 342-7885. For general questions, please contact
Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosures: CUI//CEII – DO NOT RELEASE
1. Discussion of Results of FLAC Analysis and Plan and Schedule for Analysis of Alternatives
2. Round Valley Dam Nonlinear Deformation Analysis, prepared by Gannett Fleming and
dated August 29, 2024
cc: See Attached List
Document Accession #: 20240930-5027 Filed Date: 09/30/2024
Frank L. Blackett, P.E., Regional Engineer
September 27, 2024
Page 2
cc: via hard copy w/enclosures
Sharon Tapia, Division Manager
Department of Water Resources
Division of Safety of Dams
2720 Gateway Oaks Drive, Suite 300
Sacramento, CA 95833
via email w/enclosures
Richard A. Keizer Jr., P.E., DSOD Design Engineer
richard.keizer@water.ca.gov
Document Accession #: 20240930-5027 Filed Date: 09/30/2024