Loading...
HomeMy WebLinkAbout09.30.2024 Board Correspondence - FW_ Progress Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Pack, Joshua Cc:Nevers, Dawn Subject:Board Correspondence - FW: Progress Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Monday, September 30, 2024 4:02:37 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, September 30, 2024 5:15 AM Subject: Progress Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 9/30/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Progress Report Description: Pacific Gas and Electric Company submits Spillway Rehabilitation Project Third Monthly Construction Report for August 2024 re the Bucks Diversion Dam, part of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240930- 5011__;!!KNMwiTCp4spf!DSJF2iyUaU99FeOxMARqU1hcEC3NsW_uQUhZDoQXcu-4Wqsy2S3jVH-PBj1SiJA5szPDM8VS4o1UTd24TKGeVlpiX- PPs-ejDzOx$ To modify your subscriptions, click here: 4Wqsy2S3jVH-PBj1SiJA5szPDM8VS4o1UTd24TKGeVlpiX-PPs3JhUs5D$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DSJF2iyUaU99FeOxMARqU1hcEC3NsW_uQUhZDoQXcu- 4Wqsy2S3jVH-PBj1SiJA5szPDM8VS4o1UTd24TKGeVlpiX-PPsxu1Ipgg$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 September 27, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Diversion Dam, NATDAM No. CA00331 Spillway Rehabilitation Project Third Monthly Construction Report (August 2024) ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) third monthly construction report for the spillway rehabilitation project at Bucks Diversion Dam, which is part of PG&E’s Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. In a letter dated May 7, 2024, FERC provided PG&E authorization to proceed with the project and requested that PG&E file monthly reports to document the progress of construction. PG&E provided the first monthly construction report for this project in a letter dated June 20, 2024. The third monthly construction report is provided in (Enclosure 1). The report provides details on the project’s construction activities for the month of August 2024. The ongoing civil construction work consists of rough demolition, rock excavation, slush grout installation, establishing grades and locations for new spillway section, and placement of concrete for the spillway cutoff wall. This work is scheduled to be completed by November 2024 and will be documented in a final construction report. PG&E will submit the final construction report, including as-built drawings, to FERC within 90 days of project completion, or by February 28, 2025. Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Matthew Joseph Hydro License Compliance Supervisor Enclosure: CUI//CEII – DO NOT RELEASE 1. Bucks Diversion Dam Spillway Rehabilitation, Monthly Construction Report No. 3, prepared by PG&E and dated August 2024 Document Accession #: 20240930-5011 Filed Date: 09/30/2024 Document Content(s) PGE20240927_619_BucksDivSpill_AugustMCR_Ltr.pdf...........................1 Document Accession #: 20240930-5011 Filed Date: 09/30/2024