Loading...
HomeMy WebLinkAbout10.16.2024 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:BOS; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al. Date:Wednesday, October 16, 2024 8:12:05 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, October 16, 2024 5:55 AM Subject: Dam Safety Compliance Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 10/16/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-2107-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits Authorization Request to Replace Radial Bypass Gate Hoist and Controls at the Poe Dam of the Poe Hydroelectric Project under P-2107. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20241016- 5035__;!!KNMwiTCp4spf!C7W-RWiWJC6AUk-KfZENs5GKTrkdxSjWiHKngYgMMPVknUShU- EsOuwazDfbFE1z3EKftCOiAbvMLU_4WVcQoiiLjoIklWsmTHdm$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!C7W- RWiWJC6AUk-KfZENs5GKTrkdxSjWiHKngYgMMPVknUShU- EsOuwazDfbFE1z3EKftCOiAbvMLU_4WVcQoiiLjoIklTR3aphK$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!C7W-RWiWJC6AUk- KfZENs5GKTrkdxSjWiHKngYgMMPVknUShU- EsOuwazDfbFE1z3EKftCOiAbvMLU_4WVcQoiiLjoIklfq9O4b4$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 October 15, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Poe Hydroelectric Project, FERC No. 2107-CA Poe Dam, NATDAM No. CA00328 Authorization Request to Replace Radial Bypass Gate Hoist and Controls ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) submittal package for the project to replace the hoist and controls for the radial bypass gate at Poe Dam, which is part of PG&E’s Poe Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 2107. The purpose of the project is to improve the hoist equipment to safely operate the radial bypass gate for flow use. The new system will include new anchors, connections, and the upgraded gate hoist and control system. Enclosed with this submittal are final 100-percent project documents, which consist of the project description (Enclosure 1), gate hoist specifications (Enclosure 2), supporting calculations (Enclosures 3 and 4), design drawings (Enclosures 5 and 6), the design criteria memorandum (Enclosure 7), and the quality control inspection program (Enclosure 8). PG&E has reviewed the documents prepared by consultants and concurs with the information presented therein. PG&E plans to release the project to construction on August 1, 2025, to support a construction mobilization on August 8, 2025. PG&E plans to provide a final construction report within 90 days of completing construction. If a final construction report has not yet been provided, PG&E will provide an update on the project status and a plan and schedule for further action by March 30, 2026. PG&E respectfully requests FERC authorization to proceed with the project. Should you have technical questions concerning this matter, please contact Chris Tomes, project engineer for Document Accession #: 20241016-5035 Filed Date: 10/16/2024 Frank L. Blackett, P.E., Regional Engineer October 15, 2024 Page 2 PG&E, at (530) 531-7976. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. Project Description, Poe Dam Replace Radial Bypass Hoist and Controls Project, prepared by PG&E and dated September 26, 2024 2. Bypass Gate Hoist Specification for Pacific Gas & Electric Poe Dam Bypass Gate Hoist and Control Project, prepared by Mesa Associates, Inc., and dated June 28, 2022 3. Poe Dam Bypass Gate Hoist Replacement (Calculations), prepared by Mesa Associates, Inc., and dated September 13, 2024 4. Poe Dam – Bypass Gate Hoist and Control Project, Calculation Package, prepared by Timberland Equipment Limited and dated June 28, 2024 5. 100% Design Drawings, Civil Facility, prepared by Mesa Associates, Inc., and dated September 13, 2024 6. 100% Design Drawings, Gate Hoist, prepared by Timberland Equipment Limited and dated March 28, 2024 7. Poe Dam Bypass Gate Hoist Replacement, Design Criteria Memorandum, prepared by Mesa Associates, Inc., and dated August 5, 2024 8. Poe Dam Bypass Gate Hoist Replacement, Quality Control Inspection Program, Revision 1, prepared by PG&E and dated September 26, 2024 cc: via hard copy w/enclosures Sharon Tapia, Division Manager Department of Water Resources Division of Safety of Dams 2720 Gateway Oaks Drive, Suite 300 Sacramento, CA 95833 Document Accession #: 20241016-5035 Filed Date: 10/16/2024 Document Content(s) PGE20241015_2107_Replace_Radial_BPGH_ConstPkge_Ltr.pdf....................1 Document Accession #: 20241016-5035 Filed Date: 10/16/2024