Loading...
HomeMy WebLinkAbout10.10.2024 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company Date:Thursday, October 10, 2024 4:49:34 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, October 10, 2024 1:26 PM Subject: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 10/10/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits Design Change Notification No. 3 for the spillway rehabilitation project at the Bucks Diversion Dam, part of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20241010- 5195__;!!KNMwiTCp4spf!D5knFTSCT4H2EBXjQoooqkmDdDhGvqWw9awHP7r- KIrgvuWz8aGU1E4cfPtNZsbhdeF2ys2KHyx385Srq1LoHEYfs8fDpCEt7msY$ To modify your subscriptions, click here: KIrgvuWz8aGU1E4cfPtNZsbhdeF2ys2KHyx385Srq1LoHEYfs8fDpDrXMmC6$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!D5knFTSCT4H2EBXjQoooqkmDdDhGvqWw9awHP7r- KIrgvuWz8aGU1E4cfPtNZsbhdeF2ys2KHyx385Srq1LoHEYfs8fDpAYm61y2$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 October 10, 2024 Via Electronic Submittal (E-File) Frank Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Diversion Dam, NATDAM No. CA00331 Spillway Rehabilitation Project – Design Change Notification 3 ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Design Change Notification 3 (DCN 3) for the spillway rehabilitation project at Bucks Diversion Dam (or Lower Bucks Dam), which is part of Pacific Gas and Electric Company’s (PG&E) Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. FERC authorized the spillway rehabilitation in a letter to PG&E dated May 7, 2024. A summary of DCN 3 is provided in (Enclosure 1). DCN 3 is included with this letter for FERC review and authorization (Enclosure 2). Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762 -9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. Summary of Design Change Notification 3 for the Spillway Rehabilitation Project 2. DCN 3 for the Spillway Rehabilitation Project at Bucks Diversion Dam Document Accession #: 20241010-5195 Filed Date: 10/10/2024 Document Content(s) PGE20241010_619_BucksDivSpillway_DCN03_Ltr.pdf ...........................1 Document Accession #: 20241010-5195 Filed Date: 10/10/2024