HomeMy WebLinkAbout10.10.2024 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board
To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis;
Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie
Cc:Nevers, Dawn
Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company
Date:Thursday, October 10, 2024 4:49:34 PM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Thursday, October 10, 2024 1:26 PM
Subject: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or
replying..
On 10/10/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Dam Safety Compliance Report
Description: Pacific Gas and Electric Company submits Design Change Notification No. 3 for the spillway rehabilitation project at the Bucks
Diversion Dam, part of the Bucks Creek Hydroelectric Project under P-619.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20241010-
5195__;!!KNMwiTCp4spf!D5knFTSCT4H2EBXjQoooqkmDdDhGvqWw9awHP7r-
KIrgvuWz8aGU1E4cfPtNZsbhdeF2ys2KHyx385Srq1LoHEYfs8fDpCEt7msY$
To modify your subscriptions, click here:
KIrgvuWz8aGU1E4cfPtNZsbhdeF2ys2KHyx385Srq1LoHEYfs8fDpDrXMmC6$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!D5knFTSCT4H2EBXjQoooqkmDdDhGvqWw9awHP7r-
KIrgvuWz8aGU1E4cfPtNZsbhdeF2ys2KHyx385Srq1LoHEYfs8fDpAYm61y2$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
October 10, 2024
Via Electronic Submittal (E-File)
Frank Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
Bucks Diversion Dam, NATDAM No. CA00331
Spillway Rehabilitation Project – Design Change Notification 3
ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents Design Change Notification 3 (DCN 3) for the spillway rehabilitation
project at Bucks Diversion Dam (or Lower Bucks Dam), which is part of Pacific Gas and
Electric Company’s (PG&E) Bucks Creek Hydroelectric Project, Federal Energy
Regulatory Commission (FERC) No. 619. FERC authorized the spillway rehabilitation in a
letter to PG&E dated May 7, 2024.
A summary of DCN 3 is provided in (Enclosure 1). DCN 3 is included with this letter for
FERC review and authorization (Enclosure 2).
Should you have technical questions concerning this matter, please contact Ben Fontana,
senior dam safety engineer for PG&E, at (530) 762 -9459. For general questions, please
contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosures: CUI//CEII – DO NOT RELEASE
1. Summary of Design Change Notification 3 for the Spillway Rehabilitation Project
2. DCN 3 for the Spillway Rehabilitation Project at Bucks Diversion Dam
Document Accession #: 20241010-5195 Filed Date: 10/10/2024
Document Content(s)
PGE20241010_619_BucksDivSpillway_DCN03_Ltr.pdf ...........................1
Document Accession #: 20241010-5195 Filed Date: 10/10/2024